P 6
Please retain product label and instructions for future reference
Please retain product label and instructions for future reference
22
6x20mm screws per casement stay
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
Step 12
Fix the casment stay to the
opening window then align
the fixings onto the the
window panel frame. ensure
thecasement stay fits into
fixings when closed before
screwing them down using
x12 20mm screws.
AFTER TREATMENT:
score around protective
cover on glazing and
carefuly peel
covering back
Step 9
Use 40mm screws to fix
each fascia block, fascia and
Shed Diamond.
4
4
1
13
10
18x 40mm Screws
15
15
Step 10
To fix the lock in place. Screw the Staple
to the Door Gable or Slave door.
Making sure the Hasp is in line with
the staple and screw into the Door or
Master door.
To lock the Door, place the Hasp over the
Staple and twist into the lock position as
shown.
8x30mm screws.
Pre drill
hole
30mm
screw
30mm
screw
Pre drill
hole
19
Place the Cloaking Strip to the
rear of one of the doors. Fixing in
position screwing through the door
into the cloaking strip with 3x30mm
screws.
Align the tower bolts onto the
vertical framing of the slave
door, secure the bolts to the
top and bottom using 6x30mm
black screws per tower bolt.
Mark the position of the bolt
& drill a hole above and below
for the bolt to catch in to.
15x30mm Black Screws
21
20
Step 11