Adesys SVL Series Скачать руководство пользователя страница 6

Page 6

Manual SVL 4G Weblogger 

Adesys B.V. | Wateringen

The use of a ‘Prepaid’ SIM card for dialling purposes is strongly discouraged. The mobile network cannot 

automatically request the call credit, which means that this can be run down without anyone noticing, 

resulting in outgoing notifications coming to a standstill.

2.4  Antenna

Connect the antenna cable to the SVL’s antenna connection. The antenna plus associated cable can be 

obtained from Adésys. The antenna should be affixed to as high a point as possible to obtain the best 

possible range.

After installation, always check the field strength of the antenna signal (max. is 5 flashes of the yellow 

‘network’ LED). Notification of changes in signal strength will always take place after a long delay (± 30 

seconds). Take this into account if, for example, the antenna is moved.

2.5  Power supply

2.5.1  SV-20 mains adapter

A 230Vac/12Vdc mains adapter with item number SV-20 can be obtained as an option to supply power to 

the SVL. 

When fitting the terminal block to the power supply cable, ensure that the polarity plus (+) and minus (-) is 

correct. 

An extra power supply fuse is not necessary here.

If the SVL is not supplied with power using the above-mentioned mains adapter, the connection 

regulations in the section below apply.

2.5.2  Power supply

Connect the SVL to a DC power supply of 12 to 46 Vdc (at least 8.5 W) or a transformer of 20 to 35 Vac. The 

power supply input of the SVL is not galvanically isolated from the other connections. The GND connection 

of the power supply connector is directly connected internally to the GND connection of the input 

connector and the COM port.

If the SVL is connected to an application (process controller, PLC, computer, active sensor, etc.) without 

galvanic isolation and the SVL is connected to the same power supply, there is a real chance of earth loops 

and/or short circuits in this power supply.

2.6  Reset key

The reset key has three functions: first of all, it is used to interrupt the alarm. Pressing this briefly ends the 

current notification; the SMS messages that have not yet been sent are not sent.

A second function of the reset key is to restart the dialer. The dialer can be restarted by holding this key 

down for a period of 8 seconds. This only occurs if a power supply is connected.

If no power supply is connected, the reset key functions as an off button. Holding the key down for a 

period of 8 seconds switches off the dialer.

Statuses of inputs will 

not

 be stored in a permanent memory. If the supply voltage fails, and the built-in 

supercap is entirely discharged, the contents of this memory is lost. If the SVL is restarted manually, this 

status will also be reset. When the supply voltage is restored, the SVL behaves as if it is being started up 

for the first time. This means that:

•  After the supply voltage has been restored, only active inputs are reported once again;

•  No recovery message will be sent if the status of the input has been recovered during this power failure. 

The fourth functionality is for when there is something wrong and there seem to be no connection. By 

pushing the reset key for a duration of 3 seconds, releasing it 3 seconds and doing this 3 times the DHCP 

will be enabled. By enabling the DHCP it is possible to make changes with SV-prog.

2.7 Ethernet

The Ethernet connection can be used for an external connection. This is set up in the SVL: see the SV-prog 

section. By default this is set up to connect to Checkmyproces.com.

 

2.8  2G/4G connection

To use the SVL with a 2G/4G connection, a SIM card with Internet subscription should be installed in the 

SVL. It is important that the correct APN, APN user and APN password are entered, otherwise the SVL will 

Содержание SVL Series

Страница 1: ...MEASURING ALERTING CONNECTING EN Manual SVL Version 06 2019...

Страница 2: ...2 7 Ethernet 6 2 8 2G 4G connection 6 2 9 Inputs and outputs 7 3 SV prog 7 3 1 Installation 7 3 2 Status screen 7 3 3 Call list 7 3 4 I O 7 3 4 1 Input delay 7 3 4 2 Recovery report idle 8 3 4 3 Syst...

Страница 3: ...oltage protection device To reduce the probability of damage to the equipment the SVL should be placed in an environment protected against electrostatic discharge ESD The SVL is intended for use as a...

Страница 4: ...ge You should therefore discuss the remaining risk with your insurer 1 8 Identification 1 Reset button 2 LED status indicator general status on busy antenna level network error message error 3 Antenna...

Страница 5: ...re connection Put the SVL onto the DIN rail at an angle 1 It is important that the SVL s DIN rail clip is positioned on the top of the DIN rail Tilt the SVL to clip it into place 2 Then check whether...

Страница 6: ...solation and the SVL is connected to the same power supply there is a real chance of earth loops and or short circuits in this power supply 2 6 Reset key The reset key has three functions first of all...

Страница 7: ...VL has been switched on the tool will display this in the overview after a few seconds and the SVL can be configured by clicking it When search dialers is pressed SV prog shows all accessible dialers...

Страница 8: ...lowing exceptions Data connection URL http svx meetcentrale nl 80 severa Protocol http Port 80 System settings URL mqtt meetcentrale nl Protocol mqtt Port 1883 3 5 2 Own server It is also possible to...

Страница 9: ...put channel 1 is active After a few seconds the green LED on busy flashes faster to indicate that the SMS message is being sent The green LED on busy again flashes 1x The SMS message has been sent The...

Страница 10: ...parameter1 parameter2 Command O Output Parameter1 A Active of I Idle of P Puls schakelen default 2 seconden active Parameter2 Ingangsnummer Note The output number is not the same as the relay number...

Страница 11: ...80 5x Antenna level 81 100 Faster Establishing connection clientmode Number of flashes for on busy green Off SVA is switched off On SVA is switched on Faster Starting up sending message 1x Input 1 ac...

Страница 12: ...tage Contact or Digital Input mode Open Collector OC outputs Switchable voltage level Imax per output Outputs are protected against overload Detection disconnection mechanism per 4 outputs arranged Sh...

Страница 13: ...res above 2000 metres the maximum operating temperature is reduced by 1 5 C per 300 metres up to a maximum heigth of 4000 metres Regulations EMC Emission EN 301 489 01 V1 9 2 EN 301 489 03 V1 4 1 Clas...

Страница 14: ...so available in this SV product line SVA 4G alarm dialler SVM 4G modem Checkmyprocess com Industrial 4G SMS E mail alarm dialler for monitoring of your technical processes Industrial 4G modem sms alar...

Отзывы: