
Theory of Operation
SCP-PCU796-010-04H
2
June 24, 2003
PCU-796 List 1
The PCU-796 is not required in Central Offices (CO) that use Nonintegrated MLT-2 systems. Figure 2 shows the
typical connections of Nonintegrated MLT-2. In this case, the Sleeve lead passes through the PGTC to the No Test
Trunk in the switch. MLT interprets -48 V on the Ring lead as
Test OK
. Because the PGTC remains inactive
during PG-Plus testing, the -48 V is returned by the No Test Trunk when the MLT opens the Sleeve lead at the
end of testing.
Figure 2.
Non-Integrated MLT-2
Содержание PG-PLUS PCU-796
Страница 4: ...Inspecting Your Shipment SCP PCU796 010 04H June 24 2003 PCU 796 List 1 ...
Страница 6: ...SCP PCU796 010 04H ii June 24 2003 PCU 796 List 1 ...
Страница 8: ...SCP PCU796 010 04H iv June 24 2003 PCU 796 List 1 ...
Страница 10: ...SCP PCU796 010 04H vi June 24 2003 PCU 796 List 1 ...
Страница 23: ......