36
ADC Telecommunications, Inc.
2
Press
. The following screen appears.
The current day performance information shows the performance since the previous midnight. At
midnight of every day, the current day performance history is moved to the previous day’s history and
the current day performance information is cleared. The status of the count is shown as:
• ADJ (Adjusted): Time or date has been changed or the history cleared on the system during this
interval
• COM (Complete): Data is saved in the history register for this interval
• PAR (Partial): Data is being collected for this interval
• UNA (Unavailable):Data has not been collected for this interval or has been reset during a previous
time interval
PERFORMANCE — HDSL 7 Day History (Continued)
Step
Action
ENTER
Содержание PG-Flex FRL-842
Страница 2: ......
Страница 8: ...SCP FRL842 013 01H April 22 2003 vi ADC Telecommunications Inc...
Страница 10: ...SCP FRL842 013 01H April 22 2003 viii ADC Telecommunications Inc...
Страница 12: ...SCP FRL842 013 01H April 22 2003 x ADC Telecommunications Inc...
Страница 151: ......