
9
TELESCOPIC CEILING MOUNT
OFFICIAL REQUIREMENTS:
THE FOLLOWING SHOULD BE
STRICTLY ADHERED TO
1. At least every 3 months, check that the ceiling mount, mounting
hardware, fuse ropes and their connectors, as well as the
monitor itself, are in serviceable condition. Check that all screws
are tightened.
2. Ensure that all power, audio and coupling cabling attached to
the monitor system have no strain exerted on them, i.e.: any
and all cables must never bear any of the weight of the monitors
or their accesssories including brackets and telescopic
assemblies etc.
Should you deviate from any of the above installation and safety
instructions, or should any of the items become damaged, you must
immediately uninstall the entire system.
© ADAM Audio GmbH 2018
Even if all efforts have been made to ensure the correctness of
the information contained herein, the ADAM Audio GmbH cannot be
held responsible for potential errors or missing information.
All specifications are subject to change without notice.
Содержание 31102500
Страница 11: ...5 7 4 3 1 2 11 TELESCOPIC CEILING MOUNT...