DI - FLOW IN LINE• ADAM PUMPS
10
4. ���U������� & �����K
4.1 ���� ���D & B����RY ��H��G�
While pressing & together for 2 seconds,
the system will run a test one the LCD display
The system will then show following information:
1. Product name: ”DI FLOW”
2. Firmware version: “r1.0”
3. Current unit of measure: “Unit” “Litres”
4. Current calibration factor (imp/l): ”CAL” “40.00”
5. Power supply in Volt: “bat Vol” “2.79” (if value is
< di 2.8V else “FULL”)
6. Percentage of residual battery charge: “bat Per”
“52.95”(displayed only if supply tension is < 2.8
Volt)
When battery power is < 0.9Volt the displays
shows a battery icon (bottom left). When this
happens, display brightness will be low. It will be
necessary to change batteries:
4.2 ��������G �H� �URB���
The meter has 2 magnets fitted into the turbine.
This magnets could attract metallic powders (if
present) that could block the turbine into the meter
body. For that reason, it could be necessary to pe-
riodically verify and eventually clean the magnets.
To do this, unscrew the internal shaft and its bolt.
Take care to reassemble the turbine in the correct
mode as illustrated hereafter. .
Be careful when reassembling the turbine in the
correct direction, as in the following figure:
1. Rimove the 4 screws on the back of the meter
2. Exchange the 2 batteries with 2 AAA 1.5V alkali-
ne batteries
3. Reposition the body on the cover taking care of
not squeezing wires.
4. Screw the 4 screws to tighten the body to the
cover.