2.2 SETTING UP THE SCALES
•
The scales come with a stainless steel platform, packed
separately.
•
Place the platform in the receptacles on the top cover.
•
Do not press with excessive force as that could damage the
load cell inside.
•
If an optional scoop has been supplied, place it on top of the
platform.
•
If an optional display on Pillar is supplied, install the pillar in
the upright position into the socket at the rear of the scale by
carefully pushing the cable inside the pillar rod. Secure the
pillar rod to the socket by using two M4 screws. A black
plastic cap is provided to seal the socket from the bottom to
avoid damaging of the cable.
•
Level the scale by adjusting the four feet. The scale should
be adjusted such that the bubble in the spirit level is in the
centre of the level and the scale is supported by all four feet.
•
Turn the power ON using the switch located on the right side
of the base.
•
The unit will display the software revision number in the
“
Mass
”
window and count down while performing a self-test.
•
When ready all three displays will show zero.
2.3 DISPLAY
WINDOWS
© Adam Equipment Company 2007
5
Содержание AZplus 15
Страница 2: ...Adam Equipment Company 2007...
Страница 4: ...Adam Equipment Company 2007 2...