background image

Schmidt Hammer 

225

MEASUREMENT FOUNDATION

2

Operational procedures of test hammer

Test hammer proper operation can improve the testing accuracy. Test hammer in operation throughout the entire process 

should pay attention to hand holding instruments posture correct: namely, One hand hold the front part of the Test Ham-

mer, the other hand hold and pressure the tail of end cover. The basic essentials of operation are: slowly and evenl with 

the pushing press, vertical alignment measurement surface and no shaking.

Test hammer procedures are as follows:

1. Return zero

Test hammer strike rod withstand the concrete components surface, press tail cover lightly, positioning pins disengaged 

hook-oriented lange; slowly lifting instrument, under the action of the compression spring, strike rod shots out, hook and 

rebound hammer hung at the same time-oriented lange will be brought to zero pointer to the pointer slider, that red scale 

line on the pointer slider overlap the zero line and Gauge.

2. Test Hammer action to obtain the energy

Would have been shot out of the strike rod targeting the surface of concrete component measuring point, even slowly 

pushing and press Test Hammer, strike rod has been pressed into the Test Hammer, strike tension spring stretched; when 

the instruments to push down to a certain location , hook back on oriented lange contact to the end of adjust bolt on back 

cover and starts turn, to hook disengaged strike hammer monment, strike tension spring elongation up to the require

standard length 75mm, at this time has been nominal kinetic energy of 2.207Nm, rebound hammer in a hair-trigger state.

This operation process should be always maintained Test Hammer axis perpendicular to the inspecting surface, aviod 

pushing and pressure force is too big and speed too fast.

Содержание Schmidt Hammer 225

Страница 1: ...Schmidt Hammer 225 Schmidt Hammer 225 ADAINSTRUMENTS WWW ADAINSTRUMENTS COM...

Страница 2: ...Schmidt Hammer 225 1 3 2 3 3 5 4 5 5 7 6 7 7 8 8 9 9 9 10 13 11 15 12 15 13 1 R 14 2 15 3 16 4...

Страница 3: ...Schmidt Hammer 225 MEASUREMENT FOUNDATION Schmidt Hammer 225 10 60 22690 10180 5 40 30 50...

Страница 4: ...MEASUREMENT FOUNDATION 1 8 70 2 78 2 2 60 HRC 10 25 1 max 280 43 1 3 Schmidt Hammer 225...

Страница 5: ...MEASUREMENT FOUNDATION 17 18 1 21 19 5 10 15 4 13 20 6 17 8 7 16 17 6 7 2 12 11 18 1 2 3 21 19 4 5 19 21 10 14 15 Schmidt Hammer 225...

Страница 6: ...MEASUREMENT FOUNDATION Schmidt Hammer 225 1...

Страница 7: ...Schmidt Hammer 225 MEASUREMENT FOUNDATION 10 6 10 16 13 19 21 15 5 10 22690 18 1 6 16...

Страница 8: ...MEASUREMENT FOUNDATION Schmidt Hammer 225 0 5 8 22690 4 100 1 22690 2...

Страница 9: ...Schmidt Hammer 225 MEASUREMENT FOUNDATION 20000 003 004 97...

Страница 10: ...MEASUREMENT FOUNDATION Schmidt Hammer 225 10 48 00 000 500...

Страница 11: ...Schmidt Hammer 225 MEASUREMENT FOUNDATION 20 2 80 10 i i Hi H 10 0 0 0 0 2 0 i Hi 11...

Страница 12: ...MEASUREMENT FOUNDATION Schmidt Hammer 225 i 12...

Страница 13: ...mer 225 Schmidt Hammer 225 _______________________________________________ _________________________________________________________________________________ 0 _________________________________________...

Страница 14: ...MEASUREMENT FOUNDATION Schmidt Hammer 225 1 8 9 10 Schmidt Hammer 225 ____________ _____ ________________201__ ________________________ ______________________...

Страница 15: ...Schmidt Hammer 225 1 Schmidt Hammer 225 MEASUREMENT FOUNDATION 1...

Страница 16: ...1 R 15 20 25 30 35 40 45 50 55 15 20 25 30 35 40 45 50 55 10 20 0 0 0 0 1 5 3 0 4 5 5 0 7 5 8 0...

Страница 17: ...2 50 200 5 20 10 2...

Страница 18: ...___________________________ _____________________________________________________________________________ _______________ ______________________________________________________________________________...

Страница 19: ..._______________________________________________ ___________________ _________________ ___________________ 12 II 454 491 _________________________________...

Страница 20: ...1 2 3 4 5 6 7 8 9 WWW ADAINSTRUMENTS COM info adainstruments com...

Страница 21: ...Schmidt Hammer 225 Operating manual Test Hammer Model Schmidt Hammer Manufacturer Address WWW ADAINSTRUMENTS COM...

Страница 22: ...s 1 Working principle 23 2 Operational procedures 31 3 Inspecting methods 32 4 Calibration 33 5 Maintenance 34 6 Warranty 36 7 Exceptions from responsibility 36 8 Appendix 1 Certiicate of acceptance a...

Страница 23: ...dard tensile length of tension spring and related precision of the parts may also be to control kinetic energy purposes Strike tension spring stiffness 7 84N 0 80kgf cm Stiffness for tension spring wi...

Страница 24: ...d be divided into four directions or rotation at any angles Spherical radius exposed strike rod end is 25 1 mm collisions end with strike hammer as ring plane Whether Test Hammer manufacturers or Test...

Страница 25: ...s The deinition of rebound values by the following formula L L R Rebound values L Strike tension spring standard stretching length mm 75mm L Rebound distance at irst after strike hammer and rod are im...

Страница 26: ...MEASUREMENT FOUNDATION Schmidt Hammer 225 2...

Страница 27: ...t hook and rebound hammer hung at the same time oriented lange will be brought to zero pointer to the pointer slider that red scale line on the pointer slider overlap the zero line and Gauge 2 Test Ha...

Страница 28: ...osition and then get the Test hammer to the place ease of reading rebound values The above is a rebound test operation process which get the rebound value Ri of a measuring point Repeat the above oper...

Страница 29: ...he instrument inspecting data can calibrate on the steel anvil looked at the calibrating of rebound values Rm whether in the 8 0 2 or not With only the calibration of steel anvil Hammer rebound values...

Страница 30: ...wn and cleaned all the parts and components using gasoline or alcohol After adjusting to right dimensions of assembly wipe center guide rod using cotton with the watches oil to form a layer of thin oi...

Страница 31: ...ke out the movements part Decomposition of movement that can use the rebound hammer hit the rebound rod make the rebound pole exit from center guide rod and note that the buffer spring inside the rebo...

Страница 32: ...ft our warehouse in perfect condition and adjustment the user is expected to carry out periodic checks of the product s accuracy and general performance The manufacturer or its representatives assumes...

Страница 33: ...______________________________ _____________ name and model of the instrument Corresponds to ______________________________________________________________ designation of standard and technical requir...

Страница 34: ...r fault identiication which is under the warranty is made only in the authorized service center In no event shall manufacturer be liable before the client for direct or consewuential damages loss of p...

Страница 35: ...ice by anyone other than an authorized service center 5 Damage to products or parts caused by misuse including without limitation misapplication or nrgligence of the terms of service instruction 6 Pow...

Страница 36: ...ADA MEASUREMENT FOUNDATION WWW ADAINSTRUMENTS COM...

Отзывы: