background image

EN • 1

ENGLISH

FRANCAIS

NEDERLANDS

ES

p

A

ño

L

IT

ALIAN

o

DE

u

TSCH

662Y0500 • B

Installation, operating 

and maintenance instructions

BMR 33

Содержание BMR 33

Страница 1: ...EN 1 ENGLISH FRANCAIS NEDERLANDS espa ol ITALIANO deutsch 662Y0500 B Installation operating and maintenance instructions BMR 33...

Страница 2: ...8 Views gasket 8 Maintenance 9 Maintenance 9 Flame monitoring 9 Troubleshooting 10 Fault causes and solutions 10 Technical documentation 12 Technical data and electrical supply 12 Output table 12 Oil...

Страница 3: ...ith forced draught burners EN 60335 Part 1 Household and similar electrical appliances Safety DIN EN 267 Atomizing oil burners Definitions requirements construction and testing DIN 4755 Oil firing ins...

Страница 4: ...er step towards green technology Exhaust gas temperature The exhaust gas temperature is measured using a thermometer which can be purchased from a specialist shop The chimney sweep s inspection hole i...

Страница 5: ...hermodynamic fuel air mixing Electric motor with operating capacitor Oil pump with built in solenoid valve Automatic oil firing unit for intermittent operation Flame monitoring Ignition transformer Ig...

Страница 6: ...ank and the oil lines must be at least 5 degrees C 5 Make sure that cold outside air cannot be drawn in Burner assembly The BMR blue burner is particularly suitable for installing in standard boilers...

Страница 7: ...ncreased CO2 13 5 the oil pressure must be reduced Check the CO value when the CO2value has been adjusted to 13 14 A CO reading of over 40 mg kWh indicates that the CO2 value has been distorted by an...

Страница 8: ...ize of the mixing system proceed as follows 1 Remove the burner from the heating boiler 2 Loosen the retaining screw on the air intake nozzle and adjust the air intake nozzle Retighten the retaining s...

Страница 9: ...listed in the table on p 13 Flame monitoring Checking the flame detector Use the test socket with an ammeter or multimeter The signal flow should not exceed 5 5 A during the pre purge phase If it doe...

Страница 10: ...trodes incorrectly adjusted to nozzle Adjust as indicated in the manual Incorrect burner settings Check burner settings and readjust if necessary Burner starts and has flame but the flame goes out Dir...

Страница 11: ...Defective coupling between motor and oil pump Replace coupling Kink in oil line Check oil line and replace if necessary External valve to tank system if present may be shut Check the external valve So...

Страница 12: ...M T CF VM1 VM2 AL N PF LOA 14 LOA 14 Automatic oil firing device N Neutral M Burner motor T Ignition transformer VM 1 Solenoid valve 1 VM 2 Solenoid valve 2 AL Warning light CF Flame detector PF Oil p...

Страница 13: ...ank and oil lines Switch off the burner before filling the tank and leave it switched off for approx 3 hours to allow any sediment to settle If the oil lines are not air tight and the tank is running...

Страница 14: ...EN 14 ENGLISH FRANCAIS NEDERLANDS espa ol ITALIANO deutsch 662Y0500 B...

Отзывы: