8
⑦
cover the machine
⑧
fix the cover
2.3 Shelf installation
This product chassis specification for the standard 1u,so it can be installed in the standard shelf.
Installation steps and attention items:
1
、
Make sure the temperature in the room lower than 35
℃
(95°f).
2
、
Keep the equipment have 15cm(6 inches)space around in order to air's circulation.
3
、
From bottom to shelf installation.
4
、
When multiple components install in the frame
,
please take preventive measures to avoid
power socket overload..
2.4 Front panel
The front panel of DR series
1.
channel switching
2.
IR
receive
3.
Direction keys
4. USB port
5.
Clear
6. Enter
7. Record LED
8. Net LED
9. Alarm LED
10. Power LED
11. Menu
12. Recorder
13. Player
14. Backup
15. PTZ
16. Playback
Содержание Ai-D3 series
Страница 1: ...1 DVR User Manual Ai D3 AiP D5 AiP D7 series...
Страница 71: ...71 Channel manage page under all analog DVR mode...
Страница 72: ...72 Channel manage page under Hybrid HVR mode full digital NVR mode Pic 4 42 channel manage interface...
Страница 86: ...86 Pic 4 54 Restore to default...
Страница 93: ...93 Pic 4 61 version information 4 7 Shut down system Refer to chapter 3 5 8...