3 of 4
Acuity Brands | One Lithonia Way Conyers, GA 30012 Phone: 800.535.2465 www.acuitybrands.com © 2020 Acuity Brands Lighting, Inc. All rights reserved. Rev. 01/07/2021
IS-XXXXXX-001
Edge Gateway G2
Drop Ceiling Installation
THIS SIDE MUST
FACE FLOOR
THIS SIDE MUST
FACE FLOOR
1.82”
(UVOLT 1.865”)
3.52”
(UVOLT 4.8”)
3.50”
(UVOLT 4.725”)
1
Materials needed (per Edge Gateway install location):
1. Edge Gateway (1)
(Large arrow points to side that
MUST
face the floor)
2. Edge Gateway example placement on 60’ centers (1)
3. 4" Octagon box (1)
4. 4" Octagon box cover (1)
5. T Grid Box hanger
2
3
5
4
Edge Gateway G2 Wiring (Do not wire hot)
Strip jacket to correct length, then insert firmly
into terminal hole.
Gently pull to confirm that terminal has
securely captured wirelead.
Strip length: 3/8”
Solid or tinned leads
only
16-20 AWG
Connecting Wire to 24V Terminals
1.
2.
Max screwdriver size: 2mm
Insert precision slotted screwdriver into
terminal slot.
Gently press screwdriver into terminal,
then gently pull wire to remove.
Removing Wire from 24V Terminals
1.
2.
Legend
BLK – Unswitched Hot 120-277VAC or 120-480VAC (UVOLT)
WHT – Neutral
BLU – Switched Output*
RED (Terminal) – +24VDC
BLK (Terminal) – DC Common
GRN – Ground
*Cap off if not used
LOAD
}
Normal
+24 VDC
}
USING 24 VDC TERMINAL CONNECTIONS WITH APPROVED ACCESSORIES (OPTIONAL)