Edge Gateway G2
Open Ceiling Installation
Materials needed (per Edge Gateway install location):
1. Edge Gateway (1)
(Large arrow points to side that
MUST
face the floor)
2. Edge Gateway Layout (provided) (1)
3. 4" Octagon box (1)
4. 4" Octagon box cover (1)
5. Optional Extension (1)
(use if structure prevents proper orientation)
Edge Gateway G2 Wiring (Do not wire hot)
2
THIS SIDE MUST
FACE FLOOR
THIS SIDE MUST
FACE FLOOR
Strip jacket to correct length, then insert firmly
into terminal hole.
Gently pull to confirm that terminal has
securely captured wirelead.
Strip length: 3/8”
Solid or tinned leads
only
16-20 AWG
Connecting Wire to 24V Terminals
1.
2.
Max screwdriver size: 2mm
Insert precision slotted screwdriver into
terminal slot.
Gently press screwdriver into terminal,
then gently pull wire to remove.
Removing Wire from 24V Terminals
1.
2.
Legend
BLK – Unswitched Hot 120-277VAC or 120-480VAC (UVOLT)
WHT – Neutral
BLU – Switched Output*
RED (Terminal) – +24VDC
BLK (Terminal) – DC Common
GRN – Ground
*Cap off if not used
LOAD
}
Normal
+24 VDC
}
USING 24 VDC TERMINAL CONNECTIONS WITH APPROVED ACCESSORIES (OPTIONAL)
1.82”
(UVOLT 1.865”)
3.52”
(UVOLT 4.8”)
3.50”
(UVOLT 4.725”)
1
3
4
5