Edge Gateway G2  

Open Ceiling Installation

Materials needed (per Edge Gateway install location):

 

1.  Edge Gateway (1)  

(Large arrow points to side that 

MUST

 face the floor)

2.  Edge Gateway Layout (provided) (1)
3.  4" Octagon box (1)
4.  4" Octagon box cover (1)
5.  Optional Extension (1)  

(use if structure prevents proper orientation)

Edge Gateway G2 Wiring (Do not wire hot)

2

THIS SIDE MUST

FACE FLOOR

THIS SIDE MUST

FACE FLOOR

Strip jacket to correct length, then insert firmly 
into terminal hole.
Gently pull to confirm that terminal has 
securely captured wirelead.

Strip length: 3/8”
Solid or tinned leads 
only
16-20 AWG

Connecting Wire to 24V Terminals

1.

2.

Max screwdriver size: 2mm

Insert precision slotted screwdriver into 
terminal slot.
Gently press screwdriver into terminal, 
then gently pull wire to remove.

Removing Wire from 24V Terminals

1.

2.

 

Legend

BLK – Unswitched Hot 120-277VAC or 120-480VAC (UVOLT)
WHT – Neutral
BLU – Switched Output* 
RED (Terminal) – +24VDC
BLK (Terminal) – DC Common
GRN – Ground

*Cap off if not used

LOAD

}

Normal

+24 VDC

}

USING 24 VDC TERMINAL CONNECTIONS WITH APPROVED ACCESSORIES (OPTIONAL)

1.82”

(UVOLT 1.865”)

3.52”

(UVOLT 4.8”)

3.50”

(UVOLT 4.725”)

1

3

4

5