background image

7

5

5.  Remove backing from mounting plate adhesive 

gasket.

6

6.  Center openings and press mounting plate onto 

duct. The adhesive gasket will hold the mounting 

plate in place.

8

8.  Insert unit into opening. Be sure the air will pass 

though the ActivePure

®

 cell honeycomb matrix.

9

9.  Secure the unit to the mounting plate with (4) 

#8-32 nuts.

10

10.  Plug unit into working power receptacle.  

Hard wiring unit into HVAC system should be done 

by a licensed HVAC installer or electrical contractor 

only.

7

7.  Secure the mounting plate using (8) #8 self-tapping 

screws.

METAL DUCTWORK INSTALLATION 

(CONTINUED)

Содержание DUCTWORX

Страница 1: ...C AIR PURIFICATION SYSTEM OWNER S MANUAL Specifications Installation Operation Features Maintenance CAUTION Read manual carefully for proper procedures and operation 5420 LBJ Freeway Suite 1010 Dallas...

Страница 2: ...You may also contact activTek Customer Service at 866 736 0503 Please record the name and phone of your activTek Distributor Name___________________________________________________________ Phone_____...

Страница 3: ...one Free includes UV Lamp Item US71088 INSTALLATION HARDWARE 8 8 75 1 4 Self tapping screws Item US70679 4 6 32 X 2 inch Threaded bolts Item US70680 4 6 32 Toggle bolt wall anchors Item US70682 4 8 32...

Страница 4: ...t qualified personnel to install the proper outlet Do not alter the plug in any way Location for Protective Earth Line ABOUT DUCTWORX activTek DuctwoRx is easily mounted into the supply side of air co...

Страница 5: ...Saw for wood or metal recommended Drill Power Driver Phillips Screwdriver 3 8 Drill Bit if installing into fiberglass ducting with toggle bolts You may also need Utility Knife Tin Snips for metal duc...

Страница 6: ...or 3 5 opening using either the mounting plate or included template a a Using template mark 4 holes on duct b b Drill 4 holes where marked c c Cut between holes using tin snips ALTERNATIVE CUTTING MET...

Страница 7: ......

Страница 8: ......

Страница 9: ......

Страница 10: ......

Страница 11: ...opening Be sure the air will pass though the ActivePure cell honeycomb matrix 9 9 Secure the unit to the mounting plate with 4 8 32 nuts 10 10 Plug unit into working power receptacle Hard wiring unit...

Страница 12: ...NATIVE CUTTING METHOD FIBERGLASS DUCTWORK INSTALLATION 1 2 2 Mark location for 3 5 opening using either the mounting plate or included template Also mark the locations of 4 screw holes in corners see...

Страница 13: ...ng plate adhesive gasket 7 7 Insert 4 toggle bolts into 3 8 holes in duct Be sure toggle anchors open after inserting 8 8 Center large opening in mounting plate over 3 5 opening in duct and press plat...

Страница 14: ...nnect power supply 9 9 Secure unit with 4 nuts 2 2 Remove the 4 mounting nuts 8 Insert the unit into the mounting plate 6 6 Plug the new RCI cell into the base unit 5 5 Separate the used RCI cell from...

Страница 15: ...er is missing from the product the warranty will be voided ActivTek products are authorized for sale through activTek Distributors only Warranties are voided if a product is purchased through unauthor...

Страница 16: ...n which can be determined by turning the equipment off and on the user is encouraged to try to correct the interference by one or more of the following measures Reorient or relocate the receiving ante...

Отзывы: