Push the swing hooks through the pre-drilled holes in the swing beam (B), and secure using 1 x m10
washer and 2 M10 nuts. The second nut acts as a locking nut. Ensure the swing hook is at right
angles to the beam, as shown in the picture above.
Then attach the swing beam (part B) to your desired upright (X) of the tower, using (Part 5) 10 x
150mm bolt, M10 nut and M10 washer. The nut and washer should sit in the recessed hole as shown
in the diagram above.
Two people are needed for this next bit. Lift the A frame into the previously dug holes. One person
holds this in place. The other person lifts up the swing beam (part B) above the height of the A
frame. Then slowly lower the beam so it sits in between both parts A.
Now check that the beam is level and adjust the height by either digging the holes deeper or adding
soil to the hole.
Make sure the A frame is upright and approximately 100cm in from the end of the beam, before
continuing.
Components & Hardware:
1 x (B) 9x9/360cm
2 x (D) 30x65/40cm
6 x (2) M10 washers
11 x (3) M10 nuts
6 x (4) 5x60mm screws
1 x (5) 10x150mm bolts
2 x (6) 6x120mm screws
5 x (7) Hook