![Action Sports S001264DC-2 Скачать руководство пользователя страница 13](http://html.mh-extra.com/html/action-sports/s001264dc-2/s001264dc-2_assembly-installation-care-maintenance-and-use-instructions_2842953013.webp)
©
ACTION SPORTS EQUIPMENT PTY LIMITED – www.actionsports.com.au
Page: 13
4.
Connect the completed Leg Tubes (C & D) to the
Top Rail Loop, as shown in Fig. 4. Slide the
T-Joint (H) into the vertical leg tube (C) and
leave the hole without bolt and nut at this stage.
The Bolt and Nut will used in later steps when
the enclosure pole is connected as well.
Join the vertical leg tube (D) to the T-Joint (G) as
shown in Fig. 4. Ensure spring loaded locking
pins are aligned with locking holes and pin locks
into position, with the locking pin facing in
towards to the centre of the trampoline (Fig. 4.1)
5.
Once completed, the frame of the Trampoline
should look like Figure 5.
Mat and Net Assembly
To facilitate the assembly of the springs to the mat, please use the Spring Hook provided to
pull the springs during assembly.
Please Note
: The hooks at each end of the
spring are different in the opening. One is
wider, and the other is narrower. See the
spring as this:
Attach the end with narrower opening to the V-ring, and the end with wider opening to the
holes on the top rail. Please see below illustrations: