7
ACT Cartridge Dust Collector
Assembly
Dust Collector Anchoring
Install 3/8 inch diameter anchor bolts with a minimum of 3
inches into the foundation. Ensure foundation complies with all
local regulations and codes
Use recommended SAE torque table for the anchor bolts.
Compressed Air
The supplied compressed air must be clean, dry, and oil-
free. Set the compressed air pressure levels to 80-90
psi. Do NOT exceed 100 psi as damage may occur to
the components.
Prior to installation, purge the compressed air lines of
any dirt or buildup.
1. Install the compressed air pipe line to the air
manifold to either the top or bottom 1” NPT coupling.
Use thread sealant tape or compound on all
connections.
2. A drip tee or ball valve installed on the bottom of the
manifold is recommended to allow for the draining of
any water buildup.
3. It is also recommended to install a shut-off valve,
pressure regulator, safety exhaust valve, and filter
close to the collector.
1” NPT Female Coupling
Plastic Tubing
Air Manifold (Header)
Diaphragm Valve
Solenoid Valves
1” NPT Female Coupling
Содержание LASERPACK
Страница 1: ...IOM 101 1 v2 LASERPACK Installation and Operation Manual...
Страница 10: ...10 ACT Dust Collectors WIRING DIAGRAM 5 HP...
Страница 11: ...11 ACT Dust Collectors WIRING DIAGRAM 10 HP...