ACR Electronics RCL-75 Скачать руководство пользователя страница 7

Y1-03-0158H 

 

6

 

bulkhead, use a cable outlet (available at marine hardware stores). Wire 
should be supported where necessary by the use of cable straps. 

The location selected must be sufficiently rigid to support the  weight of 
the  total  installation.  Also  consider  surrounding  hazards  such  as 
equipment  movement,  hatches  being  opened,  accidental  covering, 
personnel traffic, etc. 

Depending  on  the  location  selected,  your  light  will  need  1/4”  diameter 
stainless  steel  bolts,  nuts,  and  washers.  If  the  mounting  area  is  robust 
enough,  pan-head lag screws may be used. If the surface area can  be 
reached from the underside, bolting  with lock nuts and  washers should 
be used. 

 

 

When  mounting,  be  sure  that  the  unit  is  able  to  rotate  360°  without 
hitting  any  obstructions.  Refer  to  wiring  section  for  additional 
information. 

 

SECTION 3 - INSTALLATION 

Wiring 

The RCL-75 has two wiring requirements: 
 
1.) Connect the remote control 

Point Pad™ to the light 

2.)  Connect  the  light  to  12-volt  power  with  15  amp  rated  wiring.  The 
light works best with 13.5 volts. 

 

 

Figure 2 

Figure 3 

Содержание RCL-75

Страница 1: ...PRODUCT SUPPORT MANUAL RCL 75 Remote Control Searchlight System Model No RCL 75 Product No 1946 Y1 03 0158 Rev H...

Страница 2: ...954 981 3333 or email at service acrelectronics com Please be ready to provide the technician with the page number you wish to discuss If you have a question that is not covered in the manual please...

Страница 3: ...__ 6 SECTION 4 OPERATION _________________________________ 10 SECTION 5 CARE AND MAINTENANCE _____________________ 10 APPENDIX A SPECIFICATIONS ____________________________ 15 APPENDIX B ACCESSORIES__...

Страница 4: ...nt ASA plastic to minimize yellowing and is gasketed and finished to repel the weather SECTION 2 PREPARING TO INSTALL Unpacking the RCL 75 Before proceeding with the installation of the RCL 75 please...

Страница 5: ...above is missing please contact ACR Electronics Technical Service by email at service acrelectronics com or by phone at 1 954 981 3333 Please be ready to provide the serial number of your unit and lo...

Страница 6: ...eration should be given to the selection of a mounting location for the RCL 75 and the Point Pad remote control panel Location helps assure maximum performance of the light Typical mounting locations...

Страница 7: ...ill need 1 4 diameter stainless steel bolts nuts and washers If the mounting area is robust enough pan head lag screws may be used If the surface area can be reached from the underside bolting with lo...

Страница 8: ...rill holes will not impact or harm other items wires plumbing hardware bulkhead The URP 102 Point Pad is supplied as a surface mount unit see figure 4 A flush mount option is provided see figure 5 To...

Страница 9: ...h is to be located i e bulkheads wires plumbing hardware Check in advance to verify the wiring harness can be routed to this location Mounting the Light Make sure area is clean and dry Decide on the u...

Страница 10: ...3 4 Put the mounting gasket on the deck mount or shaped plate if used Use caulk or bedding compound to seal bolt and wire holes before deck mount is attached to deck The plates are keyed to each other...

Страница 11: ...etergent and water if desired Rotate the light left then right and up then down periodically to keep motors and turning surfaces clean and operational WARNING DO NOT rotate the light manually This wil...

Страница 12: ...t sides of front and 4 counter sunk Phillips screws attaching top cover to lower case Use L wrench furnished with light see Figure 8 3 Carefully remove top cover by lifting straight up see Figure 9 4...

Страница 13: ...leeve with needle nose pliers and push through the partition wall see Figure 12 7 Gently remove the entire reflector assembly from the body see Figure 13 8 Place the reflector assembly face down 9 Rem...

Страница 14: ...gear toothed rack is on the right and the smooth arch is on the left The wires on the left are formed sharply down and back of the bulb assembly then a 1 inch 2 54cm diameter loop is formed back up a...

Страница 15: ...screw holes at the front match the metal braces 22 Reinstall the four 4 long cover screws starting from the back and work forward then install the two 2 top screws at each side total of 4 Tighten all...

Страница 16: ...mum with Molex quick connect locking connectors on each end Peak beam candle power 180 000 candela Lamp Dual beam 55 watt halogen Reflector size 6 x 4 5 Beam spread degrees Horizontal 8 Approx Vertica...

Страница 17: ...r operating life 9403 Base gasket 9425 2 nd station cable harness 17 5 2m length water proof connector 9426 Riser 1 inch 2 54cm Can be stacked to raise light 9427 2 nd station Point Pad control flush...

Страница 18: ...Y1 03 0158H 17 Figure 21 Installation with extension cable harness Figure 22 Installation with second Point Pad station...

Страница 19: ...ND EXPRESS OR IMPLIED AS TO MERCHANTABILITY FITNESS FOR A PARTICULAR PURPOSE OR ANY OTHER MATTER WITH RESPECT TO THIS PRODUCT The Company shall not be liable for consequential or special damages To pl...

Страница 20: ...N 60945 2002 Immunity IEC 61000 4 2 1995 Electrostatic Discharge IEC 61000 4 3 1995 Radiated Immunity IEC 61000 4 6 1996 Conducted Immunity Power and I O Leads IEC 61000 4 11 1994 Voltage Dips and Int...

Отзывы: