Acqiris SA220E Скачать руководство пользователя страница 4

Notices

Operator is responsible to maintain safe operating conditions. To ensure safe
operating conditions, modules should not be operated beyond the full temperature
range specified in the datasheet. Exceeding safe operating conditions can result in
shorter lifespans, improper module performance and user safety issues. When the
modules are in use and operation within the specified full temperature range is not
maintained, module surface temperatures may exceed safe handling conditions which
can cause discomfort or burns if touched. In the event of a card exceeding the full
temperature range, always allow the module to cool before touching.

Exercise extreme caution when a shock hazard is present. Lethal voltage may be present on
cable connector jacks or test fixtures. The American National Standards Institute (ANSI)
states that a shock hazard exists when voltage levels greater than 30 V RMS, 42.4 V peak, or
60 V DC are present. A good safety practice is to expect that hazardous voltage is present in
any unknown circuit before measuring.

Operators of this product must be protected from electric shock at all times. The responsible
body must ensure that operators are prevented access and/or insulated from every connection
point. In some cases, connections must be exposed to potential human contact. Product
operators in these circumstances must be trained to protect themselves from the risk of
electric shock. If the circuit is capable of operating at or above 1000 V, no conductive part of
the circuit may be exposed.

Do not connect modules directly to unlimited power circuits. They are intended to be used with
impedance-limited sources. NEVER connect modules directly to AC mains. When connecting
sources to modules, install protective devices to limit fault current and voltage to the module.

Before operating a card, ensure that the line cord is connected to a properly-grounded power
receptacle. Inspect the connecting cables, test leads, and jumpers for possible wear, cracks,
or breaks before each use.

When installing equipment where access to the main power cord is restricted, such as rack
mounting, a separate main input power disconnect device must be provided in close proximity
to the equipment and within easy reach of the operator.

For maximum safety, do not touch the product, test cables, or any other instruments while
power is applied to the circuit under test. ALWAYS remove power from the entire test system
and discharge any capacitors before: connecting or disconnecting cables or jumpers, installing
or removing ADC modules, or making internal changes, such as installing or removing jumpers.

Do not touch any object that could provide a current path to the common side of the circuit
under test or power line (earth) ground. Always make measurements with dry hands while
standing on a dry, insulated surface capable of withstanding the voltage being measured.

The module and accessories must be used in accordance with its specifications and operating
instructions, or the safety of the equipment may be impaired.

Do not exceed the maximum signal levels of the modules and accessories, as defined in the
specifications and operating information, and as shown on the module or test fixture panels, or
ADC module.

4

Acqiris SA220E Startup Guide

Содержание SA220E

Страница 1: ...Acqiris SA220E Acquisition module 2 channels 14 bit 2 GS s DC to 1 2 GHz bandwidth with real time processing Start up Guide...

Страница 2: ...governed by international copyright laws Contact us Feel free to contact Acqiris experts and send an email to support acqiris com Worldwide contact for support or repair For any question or inquiry yo...

Страница 3: ...he SA220E signal acquisition module This product is intended for use by qualified personnel who recognize shock hazards and are familiar with the safety precautions required to avoid possible injury R...

Страница 4: ...o not connect modules directly to unlimited power circuits They are intended to be used with impedance limited sources NEVER connect modules directly to AC mains When connecting sources to modules ins...

Страница 5: ...replacement must be done by Acqiris No operator serviceable parts inside Refer servicing to qualified personnel To prevent electrical shock do not remove covers Cleaning Precautions To prevent electr...

Страница 6: ...entation product To return unwanted products contact your local Acqiris office This symbol indicates the time period during which no hazardous or toxic substance elements are expected to leak or deter...

Страница 7: ...ows 10 users 11 Software installation for Linux users 11 Step 4 Install the ADC Module 11 First installation on a computer 11 Power down and power up sequences 14 Fixing the module on the main structu...

Страница 8: ...ctronic assemblies A static safe work station uses for instance two types of ESD protection conductive table mat and wrist strap combination and conductive floor mat and heel strap combination Both ty...

Страница 9: ...070xxx US00075xxxor MY00090xxx Theserialnumber labelislocatedonasticker Ontheconnector sideofthemodule Theserialnumber canalsobereadfromtheSoftFrontPanelinterface butonlyafter the hardwareandsoftwarea...

Страница 10: ...an take a long time when installing the NET Framework Hardware Requirements A computer running one of the above operating systems and equipped with a USB C Thunderbolt 3 port The computer or laptop sh...

Страница 11: ...driver The procedure is available here https docs microsoft com en us windows hardware manufacture desktop disabling secure boot Software installation for Linux users To install the MD3 Software to r...

Страница 12: ...power cables Orientations authorized for the ADC module The SA220E can be placed horizontally or vertically keeping the Acqiris logo line horizontal The module should not be placed vertically with th...

Страница 13: ...vent from accidental cable disconnections 7 Switch on the computer 8 The SA220E should be automatically detected by the computer You may need to approve the Thunderbolt device the first time you conne...

Страница 14: ...own the computer 2 power down the ADC module The recommended power up sequence is 1 power up the ADC module 2 power up the computer Fixing the module on the main structure optional By default the ADC...

Страница 15: ...e using the sames screws B A minimum clear space of 60 mm from the face with connector panels and from the face with the power connector is required when assembling the module in the system in order t...

Страница 16: ...aluminium brackets to the main structure using screws M5 x 12 mm length using 4 2 Nm torque Example of recommended screws ISO 7380 1 ISO 14583 ISO 4762 cylindrical head screws or ISO 4017 hexagonal he...

Страница 17: ...CX User configurabledigitalInput Outputsignal DC coupling LVCMOS3 3V Output 50 source Input 5Vmax REF IN MMCX Externalreferenceclockinput AC coupledand50 terminated Itcanaccepta10MHzor a100MHzsignalfr...

Страница 18: ...pport acqiris com Step 5 Verify Operation of the SA220E Module Driver Graphical Interface MD3 Soft Front Panel The Acqiris MD3 SFP Soft Front Pannel is a graphical interface for signal acquisition mod...

Страница 19: ...by the use of a simple application which carries out several performance checks on a signal acquired from an external function generator Required Hardware An external signal source is required Almost...

Страница 20: ...ontrol FPGA firmware If the version is not up to date the tool will automatically propose to update the firmware using the firmware update utility Once the Control FPGA firmware has been updated succe...

Страница 21: ...Menu Acqiris MD3 Documentation SA220E SA220E_UserManual Data Sheet Inadditiontoadetailedproductintroduction thedatasheetsuppliesfullproductspecifications C ProgramFiles Acqiris MD3 Documentation SA220...

Страница 22: ...ent environments The AqMD3 IVI C driver can be used in Visual C or MATLAB development environment IVI NET Driver development environments The AqMD3 IVI NET driver can be used in Visual C Visual C CLI...

Страница 23: ...Acqiris SA220E Startup Guide 23...

Страница 24: ...This information is subject to change without notice Acqiris SA 2017 2019 Wednesday May 08 2019 Switzerland www acqiris com...

Отзывы: