background image

WARNING!

MODELS WITH TILING FLANGE OPTIONS:

A.  Do not let rough wall material overlap
      flange.

B.  Do not attach flange to building wall.

C. Let finished wall (tile, etc.) overlap and
     rest on shoulder.

#4

LATH,

PLASTER

BOARD, ETC.

DO NOT ATTACH

FLANGE TO WALL

CAULKING

#1

TILE, ETC.

#2  &  #3

A

B

C

NOTE: 2" WASTE
PIPE AND “P” TRAP
BY OTHERS.

A

B

C

FINISHED

FLOOR

2" WASTE PIPE 

(BY OTHERS)

BASE

1-3/8"

I N S T A L L A T I O N   I N S T R U C T I O N S 

3030-737-000 Rev. 03/04/13

RECOMMENDED PROCEDURE.

INSTALLATION INSTRUCTIONS:

1. 

Cut drain pipe to extend 1-3/8" into

    drain body. Drain pipe should be even
    with top of gasket when installation is
    completed. Position 

Shower Base 

over 

    2" waste pipe making sure that pipe is 
    centered in drain body.

2. Lubricate gasket with soap solution and
    stretch over 2" pipe with letters facing up.

3.

 

Push gasket as far as possible into joint.

4. Using a hammer and caulking tool or
    1/4" X 3/4" X 6" piece of wood instead
    of a caulking tool, work around the
    gasket with a series of blows and
    gradually drive gasket into drain body
    until it bottoms. Drain pipe should be
    even with the top of gasket.

5. Test connection before covering or
    concealing. To test: plug 2" drain and fill
    receptor with water. Check for leaks. 
    Verify proper drainage. 

This must be

    done before finishing walls.        

                                                                                                                                     

 

ACORN ENGINEERING

 

COMPANY

TERRAZZO-WARE

 

Shower Bases

800-488-8999 or 626-336-4561

FAX 626-961-2200

P.O. BOX 3527 • CITY OF INDUSTRY, CA 91744-0527 (U.S.A.)

2

 

5

4

ALTERNATE PROCEDURE

      

A. TAMP OAKUM TO 5/8" DEPTH

          B. POUR MOLTEN LEAD.
          C. TAMP LEAD CAREFULLY.

Shower Bases

 

OPTIONAL -KDG or
GASKET BY OTHERS

Отзывы: