ACORN ENGINEERING FIELD SERVICE
TOLL FREE
800-743-8259 •
LOCAL
626-855-4866 •
FAX
626-855-4863
7020-904-001
Page 8 of 11
PUSH-IN FITTING INSTALLATION
NOTE: FITTINGS AND TUBE SHOULD BE KEPT
CLEAN, BAGGED AND UNDAMAGED PRIOR TO
INSTALLATION.
2. Pull on the fitted tubing to ensure it is secure. Tube
should not come free from the fitting. Water test the
connection assembly prior to leaving the site to ensure
there are no leaks.
DISCONNECTING THE TUBE:
To disconnect the tube from the fitting ensure that the
water line is depressurized. Push collet square towards
the push-in fitting body and hold. While holding the collet
in, pull on the PE tubing to remove from the push-in fitting.
TO CUT TUBE:
Cut to fit length of 1/4” PE tubing and remove any burrs
or sharp edges. Ensure that the outside diameter is free
from score marks. Tube ends should be square.
INSERTING THE TUBE:
1. Firmly and fully insert the tubing end into the push-in
fitting up to the tube stop located approximately ½”
deep.
COLLET
COLLET
O-RING
O-RING
TUBE STOP
COLLET
COLLET
COLLET
Date: 03/12/15
Please visit
for most current specifications.
www.acorndrinkingfountains.com
INSTALLATION, OPERATIONS & MAINTENANCE MANUAL