Installation & Operation Manual
Manual #7109-260-001
PRELIMINARY STEPS
1. Read the installation instructions prior to beginning the installation.
2. Separate parts from packaging and verify all necessary parts are accounted for and undamaged. Obtain missing or
damaged parts from Acorn Safety prior to beginning installation.
3. Flush water supply lines prior to installation. This will remove unwanted debris from the lines and prevent unwanted
blockages in the safety equipment.
4. In order to comply with ANSI Z358.1, the safety equipment must be inspected periodically. An inspection tag is provided for
documentation purposes.
5. All employees at risk of injury/contamination should be informed and trained in the use of this and any other safety
equipment. The signage provided should be highly visible, posted in a well-lit area within the area served by the safety
station.
ROUGH-IN:
Page 2 of 4
Date: 05/07/13
Acorn Safety
a division of Acorn Engineering
™
Company
9
3
4
"
[247]
35
5
8
"
[906]
42
3
4
"
[1085]
WHEN AT
REST
53"
[1347]
WHEN
ACTIVATED
8"
[204]
62
1
4
"
[1581]
*33" - 45"
[383 - 1143]
AFF
26
3
8
"
[669]
1-1/4" [31]
NPT WASTE
1-1/4" [31]
NPT SUPPLY
1/2" [12] NPT
BALL VALVE
**82" - 96"
[2083 - 2438]
4"
[102]
1-1/4" [31] NPT
SUPPLY PLUGGED
GENERAL NOTES:
1. ALL DIMENSIONS ARE INCHES [MM].
2. REFER TO ADA FOR CLEAR FLOOR/GROUND SPACE AND APPROACH REQUIREMENTS.
*3. ANSI Z358.1 REQUIRES NOZZLES TO BE MOUNTED BETWEEN 33" - 45" [838 - 1143] ABOVE THE FINISHED FLOOR AND
REQUIRES A MINIMUM DISTANCE OF 6" [152] FROM ANY WALL OR OBSTRUCTION.
**4. ANSI Z358.1 REQUIRES SHOWER HEAD TO BE MOUNTED BETWEEN 82" - 96" [2083 - 2438] ABOVE THE FINISHED
FLOOR AND REQUIRES A MINIMUM DISTANCE OF 16" [406] FROM ANY WALL OR OBSTRUCTION.
1" [25] NPT
BALL VALVE
Ø9
1
8
" [232]
(4) Ø
3
8
" [10]
MTG HOLES
Ø7
1
2
" [191]
*R6" [Ø305] MIN
FROM WALL OR
OBSTRUCTION