40 from 68
Installation instructions for separator systems
3a
1
4
2
Shaft construction/assembly for reinforced concrete separators
3b
– Respect all safety and acci-
dent prevention regulations
– Unload using appropriate sus-
pension gear and chains, see
information on page 10.
– For normal ground conditions all that is
needed is a correctly sized, compacted
sand or gravel bed to allowing levelling.
The maximum ground pressure is 15 N/
cm² as per DIN 1054.
– During the construction phase,
if present, remove float and
coalescence filter from the
separator and keep in a
safe place. Protect the run-off opening
from dirt during construction. The coating
of the separator needs to be protected-
from damage, e.g. chips from falling
stonesduring filling or similar operations
– During the construction
phase, remove float and coa-
lescence basket from the sep-
arator and keep in a safe
place. Protect the run-off opening from
dirt during construction.
– Inlets and outlets up to DN
400 with corresp. PVC pipe
DIN 19534 or PE-HD pipe
DIN 19537
– The use of plastic pipes is only permit-
ted if the pipe material is sufficiently
rigid and the oil seal is impermeable to
light liquids!
– Insert connecting pipes up to the depth
of the built-in pipe in the container, and
no further. Measure the depth to which
they should be inserted and mark on the
pipe !
– Bear in mind the flow direction (inlet and
outlet). Pay attention to frost resistance!
– With the pipe connections, a 50 mm/m
(max. 3°) angulation of the connecting
line is possible.
– With the filter free system, Oleosmart,
remove float during the construction
phase and keep in a safe place. Protect
the run-off opening from dirt during con-
struction.