background image

 

ZoneScan II Field Installation Instructions 

11 | 

P a g e

 

return to ship mode (a slow flashing 
red light on LEDs). 

To redeploy the ZoneScan II Unit, proceed 
to Step M above. 

Repackaging 

To repackage the unit: 

I.

 

Disconnect yellow Gutermann 
cable from logger and MTU.   

II.

 

Disconnect carabiner from 6-foot 
lanyard. 

III.

 

Disconnect 6-foot lanyard from 
top of logger. 

IV.

 

Disconnect carabiner from 
stainless steel sling under the lid 
assembly.  

V.

 

Disconnect boot from MTU by 
loosening the sealing nut and 
boot.  Remove rubber washer. 

VI.

 

Disconnect SMA antenna 
connector from MTU. 

VII.

 

Clean dielectric grease from 
antenna cable and connector on 
MTU. 

Содержание ZoneScan II

Страница 1: ...ZoneScan II Field Installation Instructions Y63158 TUM Revision A www Aclara com...

Страница 2: ...rmware described in this document is furnished under a license and may be used or copied only in accordance with the terms of such license Disclaimer The information in this document is subject to cha...

Страница 3: ...igital device pursuant to part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference in a residential installation This equipment generates uses a...

Страница 4: ...nt structure s providing a separation distance of at least 20 cm from all persons during normal operation This device is not designed to operate in conjunction with any other antennas or transmitters...

Страница 5: ...our offrir une protection raisonnable contre l interf rence nuisible dans une installation r sidentielle Cet quipement g n re utilise et peut mettre de l nergie de fr quences radio et s il n est pas i...

Страница 6: ...n a aucun branchement externe pour tre utilis en association avec toute autre antenne ou tout transmetteur Aucune autre instruction d utilisation n est requise pour assurer la conformit aux r gles d...

Страница 7: ...installations ZoneScan Technical Manual Y20284 TUM The technical manual provides information about acoustic leak detection and monitoring ZoneScan data Commissioning Document obtain document from Ralp...

Страница 8: ...oneScan II Field Installation Instructions 8 P a g e Identification ZoneScan 820 Sensor Communication Cable 7 Non Metallic Valve Lid Antenna Assembly 6 foot Lanyard Transmission Unit Completed Assembl...

Страница 9: ...ack the Valve Lid Antenna Assembly C Unpack ZoneScan II Transmission Unit and ZoneScan Sensor Communication Cable and 6 Lanyard D Connect the top lanyard away from the logo on MTU to stainless steel s...

Страница 10: ...uccessful N Carry the fully assembled ZoneScan II Unit to the valve stack O Place the ZoneScan 820 Sensor into the valve stack first making sure it connects to valve nut and continue to lower the Unit...

Страница 11: ...t yellow Gutermann cable from logger and MTU II Disconnect carabiner from 6 foot lanyard III Disconnect 6 foot lanyard from top of logger IV Disconnect carabiner from stainless steel sling under the l...

Отзывы: