background image

TIME

MV

SV

(SV/MV/TIME display)
It indicates the Setting Value(SV), Manipulating Value(MV),
or Time(TIME)
(The display content can be changed by the ‘DISP/SELECT’
key)

AL1

It is lit when the Alarm1 output is ‘ON’

COM

(Communication indicator)
It flashes when the controller is in active communication
with a host computer

深圳利洋焊接设备

Shenzhen LiYang welding Equipment Co., Ltd

LY

z

Program Parameters Setting

Ramp Rate1:

A ramp consists of a slope(linear gradient) and a target setpoint. The control setpoint
increases or decreases at a linear ramp rate from the actual measured value until a
specified target setpoint is reached. The relative positions of the actual measured value
and the target setpoint determine whether the slope of the ramp is positive or negative.
Parameters R1, R2, R3... express the ramping rate in unites per minute(0.01~99.99),
parameters L1, L2, L3... the appropriate target setpoint in display units.
If R1 = END, the program will be ended when the program runs to the slope.

Target Setpoint 1

:

The target value to which the setpoint ramps when the programmer has been placed into
RVN.

Dwell period 1:

In a Dwell period, the target setpoint, which has been attained, remains unchanged for a
fixed period. All the dwell periods are defined by their duration in minutes with
parameters D1, D2, D3...(0~9999). When the program is running, these parameter display
the time remaining in the active dwell period. If the parameter equals zero, the dwell
period is skipped.
When the controller runs in the 

PV 

displaying status:

1). Select the target program pattern number with the 

PTN

/ key.

2). press 

SET/PROG 

key, the first program parameter appears in the upper display. The

value associated with this parameter will be shown in the lower display.
3). Use 

and 

key to modify the value.

4). Press the 

PAR/SET 

key, the next parameter appears. At the same time, the

modification has been saved in the memory. Use 

and 

key to modify the value.

Repeat this procedure till all the parameters are set. Or if there is no key operation within
16 seconds, the menu times out automatically.

WWW.LYBGA.COM

12

Содержание IR6000

Страница 1: ...WWW LYBGA COM 深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co Ltd LY BGA Rework Station User Manual IR6000 1 ...

Страница 2: ...t one time 4 IR6000 can be connected to a computer to be controlled more conveniently with a built in PC RS232 serial port and proprietary Software attached to it programmable 5 IR6000 can easily rework the variety of CPU s seat all kinds of shielding enclosures replacement of various components slot Can easily deal with lead free soldering rework 6 IR6000 sensitive temperature measurement sensor ...

Страница 3: ...as been properly connected properly before using the products Installed the equipment in stable work platform to use where the air mobility should be small as possible Avoid it closing to air conditioners fans and the other outlet In case of electrical short circuit avoid the products contacting with water Forbid using this equipment in flammable and explosive substances The operators hands or oth...

Страница 4: ...g Products should be kept in the air mobility of a smaller environment under the welding operation 2 Conservation environment of products z z Storage temperature 20 70 Storage humidity 5 to 95 non condensing 深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co Ltd LY WWW LYBGA COM 4 ...

Страница 5: ...wer 1250W Temperature Control Control mode of Upper Independent temperature control high precision closed loop control precision 0 5 Alarm Control mode of Bottom Independent temperature control high precision closed loop control precision 0 5 NO Alarm Rework Function SMD Suit for welding remove or repair packaged devices such as BGA PBGA CSP multi layer substrates EMI metallic shield product and s...

Страница 6: ... Bracket Temperature Control Parts Temperature control Table is control the upper and lower heating Can Simultaneously heated or first preheat then the upper part of heating 1 Highly Sensitive K temperature sensor 2 PCB Table 3 Power Switch 4 Upper Heater 5 X Y Lifting Regulator 6 LED Auxiliary Lighting 7 Bottom Heater Pre Heater 深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co Ltd LY WWW LYBGA COM 6...

Страница 7: ...ing Switch 9 Upper fan Switch 10 Start Switch 11 Stop Switch 12 Upper Programmable Temperature Control pc410 13 Bottom Temperature Control CH6 Self help Install PCB Table 1 2 3 Installation side support Installation Slip Installation side support WWW LYBGA COM 7 ...

Страница 8: ...深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co Ltd LY Upper Heater WWW LYBGA COM 8 ...

Страница 9: ...深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co Ltd LY Cable connector Temperature sensor WWW LYBGA COM 9 ...

Страница 10: ...器内部已设置多个常用程序段 不要轻易尝试修改程序参数 请按 PTN 键 选择您所需要的程序段 The programmable controller contains an in built setpoint generator in addition to the controller function This setpoint generator can produce a temperature time profile with 16 segments 0 9 When the program is running the current setpoint from the setpoint generator is fed to the control algorithm The current setpoint is continuously shown on the low...

Страница 11: ... lit when the PV is rising During program control is lit when the PV is constant During program control is lit when the PV is falling PTN Pattern number display Indicates the pattern number 0 9 RUN Program control runing indicator The LED indicator is lit during program control PV PV Display Indicates the Process Measured value SV It is lit when the Setting Value SV is being displayed on the lower...

Страница 12: ...ll be ended when the program runs to the slope Target Setpoint 1 The target value to which the setpoint ramps when the programmer has been placed into RVN Dwell period 1 In a Dwell period the target setpoint which has been attained remains unchanged for a fixed period All the dwell periods are defined by their duration in minutes with parameters D1 D2 D3 0 9999 When the program is running these pa...

Страница 13: ...深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co Ltd LY Program Parameter List WWW LYBGA COM 13 ...

Страница 14: ...Y Rework Operation Steps 1 be all set Fixed motherboard shift sensor sensor press close to BGA chip Adjust the height of heating head with adjustment knob Prompt BGA chip in the middle of heating head heating head away from BGA chip 2CM WWW LYBGA COM 14 ...

Страница 15: ... the following solder ball BGA chip is completely liquefied BGA chips should be subject to settlement floating state 3 Heating completed and Sensor 1 Close Switch for top and bottom Then Moving Heating head 2 Remove motherboard Clear insulating tape 3 BGA Rework Station Cooled Then close Total Power Warning z If BGA Rework Station NO Cooling Do not close the Total Power z When the temperature is n...

Страница 16: ...al of chips so as to avoid pad off chip or motherboard scrap 6 To improve success rate of Rework PCB and chips need drying and processing in principle PCB board or chip moist heat process will occur in the burst phenomenon the Rework process may hear the blasting sound of a minor According to actual situation Please self control 7 PCB board heating time is too long or repeated several times the su...

Страница 17: ... al value temperature numeric al value Temperature time S numeric al value S r1 0 5 L1 90 d1 90 r2 0 85 L2 135 d2 45 r3 0 8 L3 170 d3 40 r4 1 L4 185 d4 45 4 Lead free Computer slope S numeric al value temperature numeric al value Temperature time S numeric al value S r1 0 45 L1 90 d1 90 r2 1 L2 145 d2 40 r3 1 L3 180 d3 50 r4 1 L4 220 d4 45 5 For XBOX slope S numeric al value temperature numeric al...

Отзывы:

Похожие инструкции для IR6000