Aluminum Frame Installation
Check that the foundation is level and square. If your
foundation is larger than the greenhouse, mark a line on
it with a pencil or with a chalk line. Take a caulking gun
and put in a tube of caulking. Cut 1/4” off the top at
a 25-degree angle. Then put a bead of caulking on your
foundation approximately 1” in from the outside of the
foundation or the marked line. DO NOT CAULK
THE DOOR OPENING. Measure your door opening
in the front.
NOTE: When you are ready to assemble the greenhouse, an
extra person is required (2 extra would be great - you would
not need to brace or fasten the greenhouse to the base at
this time).
1.
SIDE WALL
Stand up the SIDE WALL (brace back end with a
ladder or a side brace), or you can fasten the side
wall down with #8 x 1" screws, make sure that it is
square on your foundation.
(See Step 1 Detail, page
15)
2.
BACK GABLE END
Take Back Gable End, set it on the foundation, push
the base against the side base and bolt the Roof Poly
End Bar to the gutter. Fasten it to the foundation
(See Step 2 Detail, page 15)
3.
FRONT GABLE END
Do the same to the Back Gable End
(mesure the door
opening on the top and bottom before fastening it to the
base)
(See Step 3 Detail, page 15)
4.
SIDE WALL
Stand up and bolt on the Roof Poly End Bars
(See Step 3 Detail, page 16)
5.
RIDGE
Take the ridge (one person at each end) and slide it between the end bars on the top. You will
notice the punched-out slots in the bottom flange of the ridge. The end slots must line up with
the bottom side of the Roof Poly End Bar. Before you slide in the ridge, put one bolt in the top
of each Roof Poly End Bar. Now slide in the ridge and slide the bolt into the ridge slot. Make
sure that the Roof Poly End Bar. bar is tight against the ridge.
(See Step 5 Details, page 16)