![Acer X1130P Series Скачать руководство пользователя страница 59](http://html.mh-extra.com/html/acer/x1130p-series/x1130p-series_service-manual_2839288059.webp)
59
7. PWR BD board must check the height of soldering tin
This step needs check connector and boss height.
A piece of screw*1pcs needs dress.
8. The assembly of OPE and LC
This step needs screw/8F.VA564.7R0*3pcs to tighten.
And the sequence needs obey according to picture.
For EMI, the rubber power is necessary.
This cord direction should like this
Screw*1pc
Содержание X1130P Series
Страница 16: ...16 System Block Diagram ...
Страница 17: ...17 Product Overview ...
Страница 18: ...18 ...
Страница 19: ...19 ...
Страница 20: ...20 ...
Страница 42: ...42 Fig 1 3 Fig 1 4 1 Press down the Clip 2 Insert the LP Module Overfill adjustment screws LP Datum of DMD HSG ...
Страница 45: ...45 Fig 3 3 Fig 3 4 Fig 3 5 Fig 3 6 Datum1 Datum2 Datum3 Clip UP CM Sponge ...
Страница 58: ...58 ...
Страница 61: ...61 Confirm the position of EMI cord right Screw Screw ...
Страница 64: ...64 12 Front IR wire to MB alignment Front IR wire should align in to these grooves ...
Страница 74: ...74 Power Supply Problems Checking Flow ...
Страница 84: ...84 Chapter 5 FRU List Exploded Diagram Module 1 Total Exploded View ...
Страница 85: ...85 ...
Страница 86: ...86 Module 2 ASSY UPPER CASE ...
Страница 87: ...87 Module 3 ASSY LOWER CASE ...
Страница 88: ...88 Module 4 ASSY FRONT CASE ...
Страница 95: ...95 X1130PA X1230PK X1230P X1230PA X1237 Customer code 0813 ...