3
Preinstallation
The preinstallation process involves the following activities:
· Selecting a site
· Unpacking components
Selecting a Site
Consider the following when selecting a site for your computer:
· Determine the best site for your system. Cable paths
should not run near equipment that might cause
electromagnetic or radio frequency interference such as
radio transmitters, television sets, copy machines, or heating
and air conditioning equipment.
· Route cables away from personnel and equipment traffic.
· Avoid dusty areas and extremes of temperature and
humidity.
Unpacking Components
Unpack the contents of each box carefully. Save all packing
materials in case you need to move or ship the system in the
future.
Check that all items are present and in good condition. Contact
your dealer immediately if anything is missing or damaged.
Wbt.book Page 3 Monday, August 2, 1999 4:07 PM
Содержание WT 300
Страница 1: ...Acer WT 300 User s Guide Wbt book Page 1 Monday August 2 1999 4 07 PM...
Страница 9: ...Getting Started Chapter 1 Wbt book Page 1 Monday August 2 1999 4 07 PM...
Страница 46: ...Chapter 1 Getting Started 38 Wbt book Page 38 Monday August 2 1999 4 07 PM...
Страница 47: ...Hardware Specifications Chapter 2 Wbt book Page 39 Monday August 2 1999 4 07 PM...