
122
Opening your system 42
P
package contents 25
Parallel ATA and Serial ATA devices
63
POST code checkpoints 31
Post-installation instructions 41
Preinstallation instructions 41
Preinstallation requirements 25
Processor 3
Product 3
Product specifications 7
R
RAID migration 75
Rear panel 19
removing CPU 47
removing the front panel 44
removing the side panel 43
S
SCSI HBA 59
SCSI HBA setup 59
SCSI RAID HBA 59
SCSI RAID HBA setup 59
Serial ATA ports 5
Storage 4
system boards
mainboard layout 11
system upgrade 39
ESD precautions 40
post-installation instructions 41
preinstallation instructions 41
T
turning off the system 27
turning on the system 26
power-on problems 27, 45
U
Upgrading the CPU 47
Upgrading the system 39
BB!H421!.!FO/cppl!!Qbhf!233!!Xfeoftebz-!Gfcsvbsz!29-!3115!!5;67!QN
Содержание G310 Altos
Страница 1: ...Acer Altos G310 User s guide ...
Страница 10: ...Contents x ...
Страница 11: ...1 System information ...
Страница 18: ...1 System information 8 ...
Страница 19: ...2 System tour ...
Страница 32: ...2 System tour 22 ...
Страница 33: ...3 Getting Started ...
Страница 34: ...This chapter gives information on setting up and starting to use your system ...
Страница 46: ...3 Getting Started 36 ...
Страница 47: ...4 Configuring the system ...
Страница 90: ...4 Configuring the system 80 ...
Страница 91: ...5 BIOS setup ...
Страница 124: ...5 BIOS setup 114 ...
Страница 125: ...Appendix A Management software installation ...
Страница 126: ...This appendix shows you how to install the ASM and EasyBUILDTM software packages ...
Страница 130: ...Appendix A Management software installation 120 ...