Page 4-9
c)
Supply coolant from the top of coolant tank.
7. Greasing the Chuck Master Jaws
a)
Stop the spindle
b)
Supply grease from the three grease cups around the chuck.
c)
Coolant splashed on the chuck will wash away the grease. Therefore,
supply grease as often as possible.
8. Check before Daily Operation
Before turning on the power
a)
Make sure that there are no abnormalities for external piping, cables and
coating intact, all doors closed ……..etc.
b)
Check the shop floor around the machine for the hazards from such as
coolant, hydraulic oil, lubricating oil, and obstacles.
c)
Make sure that the turret is not at the travel end in the x axis direction.
9. After Turning On the Power
a)
Listen to the sound of the hydraulic unit when it is operating.
b)
Make sure that the cooling fan in the electrical cabinet is operating.
c)
Make sure that the switches and indicators on the operation panel
operate correctly.
d)
Check the screen display: no alarm should be indicated.
Содержание ATL 1840E
Страница 5: ...1 SAFETY INSTRUCTIONS ...
Страница 22: ...Page 1 17 ...
Страница 24: ...2 MACHINE SPECIFICATIONS ...
Страница 25: ...Page 2 1 2 MACHINE SPECIFICATIONS 2 1 Dimensional drawing ...
Страница 27: ...Page 2 3 2 1 2 Chip Conveyor ...
Страница 31: ...3 INSTALLATION ...
Страница 34: ...3 1 2 Layout floor plan Following is a top view drawing ...
Страница 43: ...4 MAINTENANCE ...
Страница 55: ...5 CHUCK ...
Страница 64: ...Page 7 3 7 1 HEADSTOCK 1 HEADSTOCK _ 18 SPINDLE BORE 58mm 2 ...
Страница 65: ...Page 7 4 18 SPINDLE BORE 58mm 2 ...
Страница 69: ...Page 7 8 7 2 BED Z AXIS TRANSMISSION ...
Страница 71: ...Page 7 10 7 3 CARRIAGE CROSS SLIDE ...
Страница 74: ...Page 7 13 7 4 TAILSTOCK MANUAL TAILSTOCK _ 18 ...