41
Installation precautions
Before you install any system component, we recommend that you
read the following sections. These sections contain important ESD
precautions along with preinstallation and post-installation
instructions.
ESD precautions
When installing or removing system components, perform such
procedures only at an electrostatic discharge (ESD) workstation,
because the server components can be extremely sensitive to ESD. If no
such station is available, you can reduce the risk of ESD damage by
doing the following:
•
Do not remove a component from its protective packaging until
you are ready to install it.
•
Touch the metal on the server chassis before touching the server
components.
•
Wear a wrist grounding strap and attach it to a metal part of the
server before handling components.
•
If a wrist strap is not available, maintain contact with the metal
chassis throughout any procedure requiring ESD protection to
dissipate the static charge while handling the components.
•
Avoid moving around unnecessarily.
•
Hold the server components (especially boards) only by the edges.
•
Place the server components on a grounded, static-free surface.
Use a conductive foam pad if available but not the component
wrapper.
•
Do not slide the components over any surface.
AA G900 ug - EN.book Page 41 Wednesday, September 25, 2002 5:23 PM
Содержание Altos G900
Страница 1: ...Acer Altos G900 User s guide ...
Страница 10: ...x ...
Страница 16: ...xvi ...
Страница 17: ...1 System tour ...
Страница 43: ...2 System setup ...
Страница 44: ...This chapter describes the system setup procedures both for hardware and software aspects ...
Страница 55: ...3 Hardware configuration ...
Страница 56: ...This chapter describes detailed procedures for system hardware setup ...
Страница 127: ...4 BIOS setup ...
Страница 158: ...4 BIOS setup 142 Boot The Boot menu displays a list of removable device s and hard disk s available in the system ...
Страница 160: ...4 BIOS setup 144 ...
Страница 161: ...Appendix A System rack installation ...
Страница 162: ...This appendix describes the procedures for configuring the system in a rack mount fashion ...
Страница 175: ...159 5 Slide the server into the rack Figure 70 Mounting the server to the rack ...
Страница 176: ...Appendix A System rack installation 160 ...
Страница 177: ...Appendix B System management ...
Страница 178: ...This appendix gives information about the software programs and utilities bundled with your system ...
Страница 210: ...Appendix B System management 194 ...
Страница 211: ...Appendix C Equipment log and configuration worksheets ...
Страница 217: ...201 ...
Страница 218: ...Appendix C Equipment log and configuration worksheets 202 ...
Страница 219: ...Appendix D Troubleshooting ...
Страница 220: ...This appendix helps you identify and solve problems that might occur while you are using the system ...
Страница 231: ...Appendix E Codes and error messages ...
Страница 232: ...This appendix includes tables of codes and error messages that may be encountered when operating the system ...