59
(2) Firmly press the holding clips inward to lock the FDB in place.
If the holding clips do not close, the FBD is not properly
inserted.
6
Reinstall the air duct.
7
Observe the post-installation instructions described on page 38.
The system automatically detects the amount of memory installed.
Run the BIOS setup to view the new value for total system memory
and make a note of it.
Содержание Altos G540 Series
Страница 1: ...Acer Altos G540 Series User s Guide ...
Страница 10: ...x ...
Страница 11: ...1 System tour ...
Страница 24: ...1 System tour 14 System boards Mainboard ...
Страница 34: ...1 System tour 24 ...
Страница 35: ...2 System setup ...
Страница 44: ...2 System setup 34 ...
Страница 45: ...3 System upgrade ...
Страница 78: ...3 System upgrade 68 ...
Страница 79: ...4SystemBIOS ...
Страница 108: ...4 System BIOS 98 ...
Страница 109: ...5 System troubleshooting ...
Страница 120: ...5 System troubleshooting 110 ...
Страница 121: ...Appendix A Server management tools ...
Страница 122: ...This appendix gives an overview of the different server management tools supported by your server ...
Страница 129: ...Appendix B Rack mount configuration ...
Страница 130: ...This appendix shows you how to set up the Altos G540 server in a rack mount configuration ...
Страница 142: ...Appendix B Rack mount configuration 132 ...