background image

 

4

 

Installation 

The installation must only be done by a company that is familiar with bodybuilding or modifying 
vehicles, and that have the trained technical staff. 
 

4.1

 

Mechanical Installation 

Below instruction is based at mounting the step with the optional flexi fit mounting kit which is 
available under number S130 01 024. Ask your dealer for availability 
In order to mount the step you do not need to make any major vehicle adaptations. The step 
is placed under the floor in the middle of the front, middle or rear door. Chassis modifications 
are not needed, but you may need to remove some plastic underbody parts. 
Exact measurements of the product should be taken from the official installation drawings. Ask 
Acdeos  for  the  last  revision  and  official  installation  drawing.  Figures  and  drawings  in  this 
manual are only indicative.   
Installation: 
Create a safe working environment. Raise the vehicle to the appropriate working height. 
Identify  the  location  underneath  the 
vehicle where the step will be mounted. 
Ensure the cassette can be mounted in 
the  required  position  without  being 
obstructed  by  the  chassis  or  other 
vehicle parts.  
Make  sure  that  the  step  is  not  too 
close  to  hot  parts  such  as  the 
exhaust system. This can damage the 
step. 
 
The  picture  shows  the  basic  principles 
for mounting the step.  
 

Identify  where  the  4  front  mounting  bolts  will  go.  The  holes  for  this 
fixation should be drilled in the lower flange of the outer chassis bar of 
the vehicle. Drill the holes ø6.5 
mm.  Always  protect  all  drilled 
holes  with  zinc  spray.  Make 
sure there is enough material in 
the flange under the hole. Place 
the  step  with  two  bolts  at  the 
flange and support it at the rear. 
 
Take  the  flexible  mounting 
brackets supplied with the step. 
These 

brackets 

can 

be 

mounted  in  several  ways.  The 
brackets  should  be  used  to  fix 
the rear side of the step to the bottom of the vehicle. It is recommended 
that a sturdy section of the vehicle floor us used. Mount the brackets so 
that they bridge the gap between step and vehicle floor / chassis. The 
M8 studs should be placed as vertical as possible. This fixing requires 
some technical knowledge and own interpretation. 
 

Содержание AXS MD 600 M

Страница 1: ...Condensed Manual AXS MD SA mechanical step ACDEOS BV Touwbaan 1A 2352 CZ Leiderdorp Netherlands WWW ACDEOS COM Date jul 2018 Rev 2 1 AXS MDStep ...

Страница 2: ...he rear of the manual Weight total AXS MD 600 M 16 Kg AXS MD 900 M 20 Kg Load Maximum load 150 Kg 1500 N this is always labeled on the Step Materials Frame steel with EP corrosion protection and aluminum sliding profile Step Aluminum profile and plastic corner pieces Life cycle Tested life cycle of the step is 100 000 cycles with a load of 100 KG Electrical connection Waterproof 2 pin connector IP...

Страница 3: ...tep when they are operating it 5 It is recommended that the middle of the platform is used when stepping onto the step 6 NEVER drive away when the RED dashboard LED light is still on this means that the step is not properly stowed 7 The step platform must be kept clean and free of oil and other greasy materials 8 If there is any doubt about the safety of a passenger when using the step ensure they...

Страница 4: ...eet To open the step simply push with your feet at the center of the step The step will move in a little and unlock itself Take away your feet and the step will come out automatically To close the step push with your feet at the center of the step until the step is completely closed The step will lock automatically ...

Страница 5: ...vehicle where the step will be mounted Ensure the cassette can be mounted in the required position without being obstructed by the chassis or other vehicle parts Make sure that the step is not too close to hot parts such as the exhaust system This can damage the step The picture shows the basic principles for mounting the step Identify where the 4 front mounting bolts will go The holes for this fi...

Страница 6: ...bolts a little Remove the two locking screws Place a 6 mm hex key in the hex hole and adjust the load to plus or minus After adjusting fix the locking screws and M8 bolts Both sides need to be in the same position after adjustment 4 3 Electrical Installation The step comes standard without cable loom only with a simple close switch A wiring loom should be made according schedule in appendix 1 Opti...

Страница 7: ...er as used on the step 5 2 Periodic maintenance Inspection 5 2 1 Small maintenance The step has an open cassette Dirt and other particles will ingress the step So it will need regular cleaning It is recommended to spray some thin oil PTFE or silicone spray on the wheels and locking mechanism and other moving parts on a regular basis We strongly recommend MOTIP PTFE spray at all parts in the step d...

Страница 8: ...aan 1A City 2352 CZ Leiderdorp Country Netherlands Website WWW ACDEOS COM Legal represented by Mr A de Moes Conformity Product is designed tested and produced confirm The loading recommendations in the Machine directive 98 37 EG step is tested for a maximum weight of 150 Kg On behalf of producer Name Function A de Moes Engineering Date 10 December 2013 Place Leiderdorp Netherlands ...

Страница 9: ...9 7 Appendix 1 electric schedule ...

Страница 10: ...10 Appendix 2 Installation drawings AXS MD 600 M 430 ...

Страница 11: ...11 AXS MD 900 M 430 ...

Страница 12: ...12 ACDEOS BV a Mobility Networks Company Touwbaan 1A 2352 CZ Leiderdorp The Netherlands 31 71 5891819 Info acdeos com www ACDEOS com ...

Отзывы: