Accu-Steam™ G2 Gas Service Manual
24
SP8042-1911
Infrared Burner
AT2B-2099-2
When diagnosing a bad burner, often times
the exterior back side of the burner will have
black or gray discoloration in a circular or half
moon shaped
pattern (Fig 7.3J).
Fig 7.3K
Grease trough nut
location
Fig 7.3J
Bottom Panel Nut (Left)
Fig 7.3L
Bottom Panel Fastener
Bottom Panel Nut (Right)
Fig 7.3M
1. Unplug from wall receptacle.
2. Turn off gas supply and disconnect the unit from supply hose.
3. Remove the grease tray and remove the two #8-32 X 3/8” screws at the top corners of the
front plate. The front plate will hinge down, allowing access to control chamber.
4. To allow for easy removal of the burner(s), the bottom panel of the control chamber should be
removed. which also requires the removal of the grease trough.
5. Remove the nut above the grease trough, and pull the grease trough out (Fig Fig 7.3K).
6. Remove the two nuts holding the bottom panel in place, once at either end of the panel (Fig
Fig 7.3L). The remove the fastener at the back center of the bottom panel (Fig Fig 7.3M). The
bottom panel will be release and can be dropped out through the bottom of the control
chamber.
Содержание Accu-Steam G2 Series
Страница 34: ......