
— 27 —
20: Insert the lock-down bolts and torque to 45-55 ft lb (61-75 N•m).
21: Loosen the bolts that hold the conduit box to the manifold. Do not remove.
22: Swing the electrical connector into position.
23: Torque the electrical connector bolt to 25-50 ft lb (34-68 N•m).
24: Torque the conduit box bolts to 30-45 ft lb (40-61 N•m).
Suggested tools (non-sparking): 3/4” wrench, pipe wrench,
1/4” allen wrench, 9/16” wrench, screw driver, wire cutter and
wire stripper.
Содержание Red Jacket AGUMP33R1
Страница 1: ...042 153 1 Rev C 12 00 4 Submersible Petroleum AG Pumps INSTALLATION OPERATION SERVICE REPAIR PARTS...
Страница 14: ...8 4 Petroleum AG...
Страница 36: ...4 Petroleum AG PACKER MANIFOLD ASSEMBLY PARTS SIDE VIEW 8 12 13 14 11 10 9 TOP VIEW 6 6 4 7 2 2 5 1 3 30...
Страница 38: ...4 Petroleum AG FSA 1 2 3 4 4 4 PUMP PARTS 32...