1
11
NOTE
The meter is already coded and comes with a pre-inserted
black
code key that you never need to
change. Even if you use test strips from test strip boxes that contain another code key that is a different
color or has different code numbers, you never need to change the
black
code key again.
Side View
Pre-inserted black
code key
Code Key
(for example)
Top View
Infrared (IR) Window
52122_07006314001.indb 11
10/11/13 3:12 PM