Assembly Instructions / Turbochargers A150-M.. - A155-M..
4 Installing the turbocharger / 4.1 Inserting gaskets
© Copyright 2023 Turbo Systems Switzerland Ltd. All rights reserved.
HZTL455311P0006_EN
Rev. D
April 2023
4
Installing the turbocharger
4.1
Inserting gaskets
CAUTION
Inserting the gaskets
Gaskets that are forgotten, damaged or improperly inserted will lead to oil leaks.
u
Always use new gaskets and insert them carefully into the slot.
The oil is supplied (02) and drained (03) through the bracket (01).
The necessary sealing is provided by O-rings. The O-rings are not included in the Accelleron scope of
delivery.
Pin (06) as installation safety device
Turbochargers can have an oil inlet either on their right or left side; the oil inlet position can be differ-
ent for the turbocharger fitted on the left and on the right engine bank.
A pin can be installed in every support as an installation safety device to prevent inadvertent incor-
rect fitting. This pin fits into the respective slot on the foot of the bearing casing. Instructions of the
enginebuilder must be observed.
Fig. 4: Inserting the gasket
01
Oil supply
02
Oil drain
42200
O-ring
42201
Bearing casing
42202
O-ring
Page
10
/
21
Содержание A100-M radial
Страница 2: ......