background image

DC Power Input

Connect appropriate power, see powering section

Fan 1/Fan 2

Fan 1 and fan 2 location

Ground Lug

Protective Ground Point

Unit Description

Connecting

Powering

For safety reasons, connect the protective ground screw to a suitable grounding point before 

applying power. 

Note: 

Applicable wire range: 2.5–6.0mm

2

 (14–10AWG).

•  To power the unit, one of the following option must be used:

•  Fasten the Terminal Block Adapter to the back 

of the unit.

•  Establish the proper connections between the 

wires and the power sources.

•  Connect wires to the terminal block connector 

of the adapter.

Note: 

Applicable wire range: 0.82-2.1mm2(18–14 

AWG).

Via Terminal Block Adapter

Management Port

RJ45 Port (10/100/1000 BASE-T)

Console Port

RJ45 Port (RS-232)

Dry Contacts Port

RJ45 Port (4 Dry Contacts)

PIN #

Signal

1

GND1

2

Dry Contact1

3

GND3

4

Dry Contact2

5

GND2

6

Dry Contact3

7

GND4

8

Dry Contact4

Traffic Port 5

SFP+ NNI Port 1000 BASE-X/10G BASE-R

Traffic Port 6

SFP+ NNI Port 1000 BASE-X/10G BASE-R

Traffic Port 7

SFP+ Port  1000 BASE-X/10G BASE-R

Traffic Port 8

SFP+ Port 1000 BASE-X/10G BASE-R

RST

System Reset Button 

Note: 

Press the RST button for >5 seconds to reset the unit to       

factory defaults (warning: service affecting).

TX LED

BLINKING: Port is transmitting data

Link/RX LED

ON: Link is active / OFF: Link is inactive
BLINKING: Port is receiving data

STATUS LED

ON: Normal operation 
Flashing: Unit is booting up   

PWR LED
(FEED A/B)

ON: Device is powered
OFF: Device is unpowered

MIN MAJ CRIT

Minor (Yellow), Major (Red) or Critical (Red)  
alarm condition

Establish the Ethernet connections to the unit by plugging the appropriate media types to the 

proper ports of the unit (see the numbered diagram of the front panel). 

Package Contents

Basic Contents

 

Skylight LX Performance  (1)

 

Screws (4) 

 

Rubber feet (4)

 

This Hardware Installation Guide (1)

Mounting

Rack

•  Secure L-shaped mounting bracket vertically to both sides of each unit, using the provided 

screws.

•  Carefully slide each unit into the rack mount bracket. Secure with screws. The rack mount 

bracket may provide up to two bays.

Only the standard mounting brackets are NEBS compliant. The recessed brack-

ets are not NEBS compliant.
To conform to the NEBS Seismic Zone 4 requirements, the bracket must be  

secured, using screws specified by the rack manufacturer, to a NEBS Seismic 

Zone 4 compliant rack. Such screws are not provided with the bracket kit.

Note: 

For more information, refer to the Skylight LX User Manual.

•  Attach the included rubber feet to the bottom of the unit for added stability when placing it 

on a desktop or other flat surface.

• 

Ensure the fan airflow is not blocked.

Front Panel

Back Panel

When mounting unit on a wall:
•  The support surface and the fasteners you use must support at least 6.0kg 

 (13.2lbs.)

•  Cable pull—accidental or otherwise—should not exceed the 2.0kg (4.4lbs.) limit.

Wall

Note:

 Mounting Kits are ordered separately, s

ee the Accedian Ordering Guide for more details.

Desktop

Grounding

Each input should be protected by an 6-7 A, time delay fuse  

or equivalent. There should be one fuse per power feed. 
Disconnect all power sources before servicing. Removing fuses can be used as 

a disconnect method. 
Fuses must be installed on the live wire(s) and not on the grounded wire(s).

Via DC Power Cable

•  Establish the proper connections, between 

the cable end and the power sources.

•  Connect the DC connector to the back of the 

Module.

DC Power Connections

The DC power Battery Return (BR) input terminals of the unit are not con-

nected to the equipment frame (chassis) and are configured as DC-I in compli

-

ance with GR-1089-CORE.

This unit is designed for Common Bonding Network (CBN) installations only.
This unit is suitable for installation in network telecommunication facilities and 

where the National Electrical Code (NEC) applies.

Input Power Feed Polarity

A+

B+ A-

B-

Note:

 Powering Options are ordered separately, s

ee the Accedian Ordering Guide for more details

.

Ensure power source(s) to the unit have been 

turned OFF.

The Dry Contacts Interface is strictly Safety Extra Low 

Voltage (SELV).

OR

Option 1

Option 2

Отзывы: