background image

Connecting

Powering

For safety reasons, connect the protective ground lug to a suitable grounding point before 

applying power, as shown in the figure below.

 

Note

Applicable wire range: 2.5–16mm2 (14–6AWG). Lug Type: 2x Stud #10 Hole, 16mm 

Spacing.

•  Establish the proper connections between the wires and the power sources.
•  Connect wires to the terminal block connector of the power supply.

Note

Applicable wire range: 0.75-1.31mm2 (18-16 AWG).

Establish the Ethernet connections to the unit by plugging the appropriate media types to the 

proper ports of the unit (see the numbered diagram of the front panel). 

Mounting

Rack

•  Secure two L-shaped mounting brackets vertically to both sides of the unit using the 

provided screws, 

as shown in the figure below

.

To conform to the NEBS Seismic Zone 4 requirements, the bracket must be  

secured, using screws specified by the rack manufacturer, to a NEBS Seismic 

Zone 4 compliant rack. Such screws are not provided with the bracket kit.

Only the flush mounting options are NEBS compliant.

Note: 

For more information, refer to the User Material.

When mounting unit on a wall, ensure that:
•  The support surface and the fasteners used must support at least 10 kg (22 lb)
•  Cable pull (accidental or otherwise) should not exceed the 2.0 kg (4.4 lb.) limit.
•  Secure the Wallmount Kit to both sides of the unit using the provided screws, as  

shown in the figures below.

•  Install the unit on the wall in the position shown below.

Wall

Note

:

 Mounting Kits are ordered separately. See the Ordering Guide for more details.

Grounding

An approved external overcurrent protection device must be installed in the supply 

lines and be readily accessible to act as a disconnect device. The overcurrent 

protection device must disconnect all poles simultaneously and be rated 12A Max 

(Quick/Fast)

DC Power Connection

DC PSU must be connected to Class 1 Power Source (ES1) only.

This unit is designed for Common Bonding Network (CBN) installations only.
This unit is suitable for installation in network telecommunication facilities and 

where the National Electrical Code (NEC) applies. 
Ensure the unit's power source(s) have been turned OFF before servicing.
The DC Battery Return (BR) input terminal(s) of the unit are not connected to the 

equipement frame or grounding means of the equipement and must be configured 

as isolated DC Return (DC-I) in compliance with GR-1089-CORE requirements.

 AC Power Connection

•  Connect the AC plug to the AC appliance coupler.
•  Connect the power cord into a suitable power outlet. 
•  Secure the power cord through the retainer clip.

Note

:

 Power Cord must be ordered separately. See the Ordering Guide for more details.

•  Carefully slide the unit into the rack mount bracket and secure using the provided 

screws.

Desktop

•  Attach the rubber feet to the bottom of the unit for added stability when placing it on a 

desktop or other flat surface.

The AC plug must be connected to a properly grounded AC outlet.

Denmark

: Apparatets stikprop skal tilsluttes en stikkontakt med jord, som giver 

forbindelse til stikproppens jord.

Finland

: Laite on liitettävä suojakoskettimilla varustettuun pistorasiaan.

Norway

: Apparatet må tilkoples jordet stikkontakt.

Sweden

: Apparaten skall anslutas till jordat uttag.

Do not place hands, fingers or foreign objects in any holes, insertion slots or gaps.

To avoid damage to the equipment, keep objects clear of system ventilation 

inlets,  outlets and system fans, if any, ensuring the air flow through the units is 

not obstructed, and that the fans rotate freely.
Do not disassemble or alter the unit.
The intra-building ports of the equipment or subassembly is suitable for 

connection to intra-building or unexposed wiring or cabling only. The intra-

building ports of the equipment MUST NOT be metallically connected to 
interfaces that connect to the OSP or its wiring.

              DC Power Option

1

1

2

2

3

3

Ground Lug

Unit Protective Ground Point 

(Lug Type: 2x Stud #10 Hole, 16mm Spacing)

Hot-Swappable Fans Modules

Hot Air Outtake

Power Input

AC Input Connector: IEC  60320/C6 (1x)

DC Input Connectors: Phoenix, 1829345 (2x)

              AC Power Option

Back Panel

Specifications

Power

Input Power Rating

AC Input: 100-240V

AC

, 50-60Hz, 1.8-0.75A

Max

DC Input: 40-57V

DC

, 3.8-2.4A

Max

Output Power Rating

Antenna (Sync. Option): 3.3 V

DC

 ±10%, 50 mA

Max

SFP28: 3.5W

Max

 Per Port

SFP10: 3.0W

Max

 Per Port

Power Consumption

72W

Typ

, 97W

Max

 (246 BTU/Hr

Typ

, 328 BTU/Hr

Max

Physical

Dimensions (H x W x D)

36.6 x 196.6 x 316.5mm (1.4 x 7.7 x 12.4")

Weight

2.4kg (5.2lb)

Environmental

Operating Temperature

AC or DC Commercial: 0°C to +50°C (32°F to 122°F)
DC Hardened: -40°C to 65°C (-40°F to 149°F)

Storage Temperature

-40°C to 70°C (-40°F to 158°F)

Operating Humidity

5% to 85% RH, Non Condensing

Storage Humidity

5% to 95% RH, Non Condensing

Maximum Altitude

3000m (9900ft), Above Sea Level

Regulation & Standard Compliance   

(Model: NG25 )

Safety

IEC 62368-1, EN 62368-1, CSA/UL 62368-1, AS/NZS 
62368.1, J62368-1, CEI EN 62368-1, DS/EN 62368-1, SASO-
IEC-62368-1

EMC - Emission (Class A)

CISPR 32, IEC 61000-3-2, IEC 61000-3-3, EN 55032,   EN 
61000-3-2, EN 61000-3-3, FCC (47 CFR 15, Subpart B), ICES-
003, AS/NZS CISPR 32, VCCI-CISPR 32

EMC - Immunity

CISPR 35, EN 55035

EMC - Radio

ETSI EN 301 489-19, ETSI EN 303 413

Telco

NEBS Level-3: GR-63, GR-1089

Enviro

RoHS: IEC 63000, EN IEC 63000

Transceivers used in the ports must stay within 

their specifications under all operating conditions 

of the system.

Отзывы: