6
3
Preparation and installation
3.1
Removing package and checking
1.
Please prepare installation tools: knife and scissors, and wear protective gloves.
2.
Please remove wrapping film and packing belt, then remove the carton, take out the air
conditioner.
3.
Please
check the attachment list and accessory bags in the carton,
check whether the air
conditioner model is right .
Notes:
1.
After removing the outer package, please make sure that the air conditioner is placed
upright , and not placed horizontally or upside down.
2.
After removing the outer package, please check carefully whether the appearance of the air
conditioner is damaged or oil polluted, if the appearance of the air conditioner has obvious
deformation or oil stain, please contact the manufacturer in time.
3.
If there is no need to install the product immediately or it needs to be transported to other
place, please repack the air conditioner after the checking.
4.
It is recommended to recycle the unpacking materials.
3.2
Mechanical installation
Installation tool: Phillips screwdriver
Installation Steps
:
1)
Choose cut location on the cabinet according to the holing diagram, remove the shadow
area and make the installation hole.
2)
Make air conditioner flange close to cabinet door,
Fix the air conditioner on the installation
surface of the cabinet firmly with M5 screws.
3)
Check whether air conditioner is installed levelly and firmly.
Notes:
1)
Check whether air conditioner drainage loop is smooth, in case that drainage is blocked.
2)
When determine the location of the installation hole in the cabinet, you should avoid the inlet
and outlet air ports inside the cabinet are not blocked by any components inside the cabinet, and
the two should be kept a horizontal distance of more than 150mm; otherwise, it is prone to lead
Содержание MGA0800/A1
Страница 3: ...2 8 Maintenance 14 ...
Страница 16: ...15 ...