27
5E.i Safety Precautions and Equipment
Repair and maintenance of the ozone system shall be done under the
direction of qualified personnel. Qualification shall consist of instruc-
tion and training by the equipment supplier in the safeguards and pro-
cedures necessary for the safe performance of the work. A certificate
of
completion of such training shall be provided. Repair of Ozone Gen-
erator could be performed only at Absolute Ozone® facilities unless
authorized and instructed otherwise by Absolute Ozone personnel.
All equipment in an ozone plant (ozone generator, piping,
pumps, tanks…) coming in contact with gases containing ozone must
be maintained free of oil and grease. Monitoring equipment and alarm
system shall be tested and serviced according to the manufacturer’s
instructions. The planned maintenance of all safety equipment is es-
sential to worker safety.
SECTION 5 OVERVIEW AND SAFETY PROCEDURES
5E. ii Maintenance Requirements lation
It is the joint responsibility of the manufacturer, supplier, and install-
er of the Ozone generating and handling equipment to determine
whether or not the system is working properly. The operation and
maintenance manual provided with the equipment outlines the oper-
ating procedures and maintenance requirements.
5F Monitoring Equipment and location
Ambient ozone detection monitors shall be located to monitor ozone
room air and production/plant room air for indoor applications.
Proper Ozone Monitoring equipment should be used to protect per-
sonnel from dangerous levels of ozone exposure.
Absolute Ozone® could provide suitable ozone monitoring at custom-
er request.