background image

Absco Industries

Assembly Instruction Manual

ABSCO SIGNATURE GAZEBO

MODEL: ADGAZEBO33

3.11m W x 3.11m D x 2.60m H

Model: ADGAZEBO33

21/09/23

1.00

6  

 

 

Front

Rear

FITTING THE SHURELOCK BEAMS

NOTE: Beam orientation is important to prevent 

water entry.

Orientate the beam so the exterior face has the 

overlap to the top.

1. 

Safely lift and place a 

SB1

 beam inside the 

front post brackets 

BK3

 as shown.

Overlap to 

top

Overlap to 

bottom

INTERIOR

EXTERIOR

CL

4. 

Safely lift and place the side beam 

SB1

 inside 

the post brackets 

BK3

 as shown.

5. 

Make sure the ends of the beam are as far 

as they can go into the brackets, there will be a 

small gap at the top for the front due to angle.

Fasten each end with four 

FAST100

 tek screws 

as before.

6. 

Repeat these steps for the other side beam

2. 

Make sure the ends of the beam are all the 

way into the brackets and fasten each end with 

four 

FAST100

 tek screws.

These are visible screws so take time to position 

them on the centreline of the BK3 bracket and 

inset equally from the top and bottom.

3.

 Repeat these steps for the rear beam before 

proceeding to step 4.

On the exterior side of the rear beam only put in 

the lower teks for now.

0. 

Remove the protective plastic coating from 

the outside of the beam.

Содержание SIGNATURE ADGAZEBO33

Страница 1: ...u www abscosheds com au 2 fall to rear o FRONT For construction in non cyclonic areas Wind rating N3 as per AS4055 2021 If you require a higher wind rating please contact us admin absco com au or 1800...

Страница 2: ...n detail to gain a thorough understanding of assembly methods and associated details Unpack and carefully identify and check off all the parts against the parts described and illustrated on Components...

Страница 3: ...K TR35 3020 mm 3115 mm Downpipe 80 mm RWG 21 1 QTY CHECK 2925 mm 2680 m m 3045 m m 3140 mm 3105 mm 1 QTY CHECK TU 8 QTY CHECK BK3 1 QTY CHECK 1 QTY CHECK 1 QTY CHECK 2 QTY CHECK 2 QTY CHECK 100 QTY CH...

Страница 4: ...post 2 Fasten using four FAST100 tek screws and 5 16 nut setter Make sure screws are inset 20 mm from the edges of bracket for beam clearance To keep the parts aligned while fastening use a clamp or...

Страница 5: ...nchors using the post baseplate as a template Use a hammer drill with a 12mm diameter masonry drill bit drill to a depth of 100mm Fasten to foundations with four concrete screws FAST103 per post using...

Страница 6: ...K3 as shown 5 Make sure the ends of the beam are as far as they can go into the brackets there will be a small gap at the top for the front due to angle Fasten each end with four FAST100 tek screws as...

Страница 7: ...nel 4 Safely position the first panel on top of the frame all the way to the left The steel top skin will sit over the rear flashing 5 Adjust so it s butted up against the rear trim and the side of th...

Страница 8: ...skin male female features align TOP VIEW Fastening layout 7 Fasten roof panels to beams with a tek 14 x 125 mm FAST104 at the remaining positions NOTE pan fixed to centreline of beam unless noted othe...

Страница 9: ...e side of roof panel Bent tab hard up against front Top face sits on two sheet ribs Bottom face covers the rear flashing 15 90 o SIDE FLASHING REAR DETAIL 0 TR36 flashing will overhang roof panel at t...

Страница 10: ...DE VIEW 1 At the front take an outside measurement from the left to the right flashing Trim the front flashing TR37 to this length 2 Cover the front edge of the roof and flashings Carefully lift over...

Страница 11: ...im away area shown in grey with tinsnips Repeat steps at the other end to make the other end stop 3 At the rear of the structure take an outside measurement from the left to the right flashing Trim th...

Страница 12: ...mark onto the rear beam at the point shown 8 Take a string line and make a line from the high to low point this is for the two middle brackets 9 Align the bottom of the gutter bracket with the marks a...

Страница 13: ...ten and damage Predrilling may be helpful 3 Cut the downpipe to length 4 Place the dropper RWG22 into the top of the downpipe and fasten and seal press into clips and slide up until it touches the und...

Страница 14: ...art 0 General Principles AS NZS 1170 1 2002 Structural Design Actions Part 1 Permanent Imposed Other Actions AS NZS 1170 2 2021 Structural Design Actions Part 2 Wind Actions AS NZS 1170 3 2003 Design...

Отзывы: