Absco Industries
Assembly Instruction Manual
ABSCO SIGNATURE GAZEBO
MODEL: ADGAZEBO33
3.11m W x 3.11m D x 2.60m H
Model: ADGAZEBO33
21/09/23
1.00
2
Safety
Some parts may have sharp edges. It is
recommended to wear gloves when handling
items and safety glasses when drilling holes.
Sensible shoes are highly recommended.
Minimum two people are required to easily lift
and align assemblies.
Consider the weather and do not build in windy
conditions.
If the structure must be left for a period of time
uncompleted it must be made safe to prevent
damage.
TOOLS REQUIRED
Use as a guide, other tools/equipment may be suitable. Safely work within your ability.
Please wear recommended
PPE for any tool used during
construction
!
General
Read through these instructions in detail to gain
a thorough understanding of assembly methods
and associated details.
Unpack and carefully identify and check off all the
parts against the parts described and illustrated
on “Components List” page.
If you are missing anything do not begin, contact
Absco.
Site Prep
The structure shall be erected on top of suitable
foundations and anchored down appropriately.
The site for the structure must be level. An uneven
surface may result in misalignment of parts.
Region specific: If required, you have approval for
the structure. If unsure, seek advice from relevant
local authorities.
• Sheet metal locking pliers
• 4mm drill bit
• 5/16” & 3/8” nut setter
• 12mm masonry drill bit
• Chuck drill
• Impact drill driver
• Hammer drill
• 8m tape measure
• Caulking gun
• 16mm socket
• 1.8m ladder (2 required)
• Visegrips or clamps
• Pop riveter
• Stanley knife
• Masking tape
• Spirit level
• Marker
• Ruler
• Square
• String line
• 70mm hole saw
• Tin snips
IMPORTANT INFO - READ BEFORE CONSTRUCTION BEGINS