Absco Industries
Assembly Instruction Manual
GABLE SHED
N3/C1 FRAME KIT
FOR PREMIER MODELS
Model: CYCGK
02/03/21
1.5
15
BRACING FOR SIDE WALLS
Construction for the back wall is similar to the side wall.
1. Take two C2750 frame pieces for the gable wall, and partially box them together,
do not tek screw
yet
.
2. Place the unscrewed box section against the previously installed wall bracing and slide the two
pieces apart until they make contact with it and the brace on the other wall. This is shown below.
NOTE:
For 2.3m and 1.5m deep models C2750 is to be cut to suit.
3. Now the framing is at the correct length proceed to fix them together as per method described in
BOXING FRAME SECTIONS.
4. Now boxed use tek screws to fix it to the back wall from the outside of the shed. This is best done
with two people.
Side wall
Side wall
Back wall
Previously installed wall bracing on the left and
new gable wall bracing on the right.
5. Use corner brackets (BKT10) to secure the rear,
side and front wall braces together. Position as
shown and fix using four tek screws. Pre-drilling
the bracket with a 3mm drill bit will make this
easier.
The other end of the same gable wall brace
butting up against the other previously installed
wall brace.
C2750
C2750