STAGE 1:
PUSH RIDGE BEAMS TOGETHER, MAKE SURE THERE IS A 50mm OVERLAP
OF THE RIDGE CAP
STAGE 2:
INSERT RIDGE CAP JOINER INTO CONNECTED RIDGE CAPS.
MAKE SURE JOINER HAS 225mm IN EACH RIDGE CAP.
STAGE 3:
TURN RIDGE CAP OVER AND MEASURE 250mm FROM THE END OF EACH RIDGE
CAP.
PLACE TEK SCREWS IN 50mm INCREMENTS FROM SAID END.
REPEAT THIS PROCESS FOR THE OPPOSING HALF OF RIDGE BEAM
INSTRUCTIONS FOR JOINING SPLICED RIDGE BEAM
ABSCO INDUSTRIES
ASSEMBLY INSTRUCTION MANUAL
SHED MODEL: J23151GECOK
21-11-2017
Absco Industries ECO
Shed Model: J23151GECOK
PAGE 08