=
=
=
=
=
=
2 X 60BR
2253mm (88.7")
STEP 1. PRE-ASSEMBLY OF SPLICED CHANNELS
2 x 81C
2 x 60B
1 x 54A
1 x 54C
1 x 54B
1 x 81D
NOTE:
JOIN TOGETHER 16 X CHANNEL SECTIONS USING 8 X CHANNEL JOINERS (PART CSJ)
81DL
81DR
54BR
54BL
54CL
54CR
54AR
54AL
60BL
60BR
81CR
81CL
2 X 81CR
2 X 81CL
2 X 60BL
1 X 54AR
1 X 54AL
1 X 54CR
1 X 54CL
1 X 54BR
1 X 54BL
1 X 81DR
1 X 81DL
NOTE:
SOME CHANNELS HAVE
HOLES IN THEM - YOU WILL NEED
TO RE-DRILL HOLES ON ANY
CHANNEL WHERE THE CSJ
JOINING CHANNEL COVERS
HOLES ON THE CHANNELS
YOU ARE CONNECTING
ABSCO INDUSTRIES
ASSEMBLY INSTRUCTION MANUAL
SHED MODEL: J23151GECOK
21-11-2017
Absco Industries ECO
Shed Model: J23151GECOK
PAGE 07