STEP 1.
x 4
x 2
x 3
EBRH
EBLH
EBLH
EBRH
EBRH
EBLH
EBLH
EBRH
FRONT OF CARPORT
CB-2610
CB-2610
CB-2675
CB-2675
CB-2675
CB-2675
CB-2675
CB-2675
CB-2610
CB-2610
CB-2675
CB-2675
CB-2610
CB-2610
CB-2675
CB-2675
M10 x 20 BOLT
CROSS/EDGE BEAM
SPLICE PLATE
M10 WASHERS
M10 NUT
INSERT FOUR EXTRA EDGE BEAM
SPLICE PLATES IN THE TWO SIDE
EDGE BEAMS FOR LATER
CONNECTION
(REFER STEP 3A)
ON THE THREE DOUBLE CROSS
BEAMS AT EACH END, USE THE
PRE-PUNCHED 2610mm SECTION AS A
TEMPLATE TO DRILL FOUR 10mm HOLES INTO
THE 2675mm SECTION. THESE HOLES WILL
LATER BE USED FOR CONNECTION TO
COLUMN TOP BRACKETS.
JOIN THE EDGE BEAMS AND CROSS
BEAMS TOGETHER WITH THE SPLICE
PLATES, USING M10 x 20 BOLTS,
NUTS AND WASHERS AS SHOWN.
ABSCO INDUSTRIES
ASSEMBLY INSTRUCTION MANUAL
CARPORT MODEL: CPDW50
10-05-2017
Absco Industries
Skillion Carport Model: CPDW50
PAGE 07