background image

INSTALLATION AND COMMISSIONING    

 

3

 

Installation 

 
The machine is ready for installation. After uncrating your spiral mixer, 

inspect the machine for any damage that might have occurred during 

shipment. Report any damage to us before proceeding. Never attempt to 

operate this mixer with damaged parts. 

 
1). Position the mixer in its appropriate working position, the mixer must be 

installed on a horizontal and solid floor. 

 
2). Adjust the mixer feet to ensure that the mixer is level, and seat it firmly 

on all four corners. Ensure that no wheels touch the ground.    The axles 

are not designed to support the unit while mixing. 

 
3). Connect the correct power supply to the machine as indicated on the 

machine nameplate. 

 

Commissioning 

 

1). Start the mixer to check the direction of rotation of the kneading spiral 

and the bowl. When viewed from above, both kneading spiral and bowl 

should rotate clockwise. The arrow on the bowl indicates the correct 

direction of the bowl. If the rotation direction is incorrect, swap two 

phases in the plug (white and black wires) to reverse the rotation 

direction. 

 
2). Test the function of the safety emergency stop button. The machine 

must stop immediately when you press this button. 

 
3). Test the function of the limit switch for the bowl safety guard. When the 

guard is lifted, the machine must stop immediately. 

Содержание ABSFBM-200T

Страница 1: ...OWNER S MANUAL ABSFBM 200T American Baking Systems Inc 290 Legion Court S W Cedar Rapids IA 52404 Phone 319 373 5006 Fax 319 373 5008...

Страница 2: ......

Страница 3: ...CONTENTS 1 Introduction 2 Installation Commissioning 3 Operation 4 Caution 8 Cleaning Maintenance 9 Trouble Shooting 10 Parts List 12 Wiring Diagram 20...

Страница 4: ...rators should carefully read and familiarize themselves with this entire manual before attempting to operate or service this machine Complying with this manual will ensure years of safe and trouble fr...

Страница 5: ...es are not designed to support the unit while mixing 3 Connect the correct power supply to the machine as indicated on the machine nameplate Commissioning 1 Start the mixer to check the direction of r...

Страница 6: ...button to lessen the time on the timer When the spiral mixer is switched ON timers will show the set time The timer will only be operative when mixer is in AUTO mode The timer will start automaticall...

Страница 7: ...the hook is in the fast speed state D Bowl inching light When INCH lamp lights up spiral mixer is in manual inch mode This button is also operative when the safety guard is lifted E On model light Wh...

Страница 8: ...on when the safety guard is lifted Complete ingredient should be checked to ensure accuracy in scale Operation Steps 1 Auto operation A Press buttons below timer to set the desired time for reverse bo...

Страница 9: ...fast speed to start When the mixer is running at slow speed you can press button to let mixer run at fast speed 3 Control Buttons When digital panel is damaged the mixer can be operated by manual swi...

Страница 10: ...ectrical connections or non insulated cables 7 Periodically check the state of the power cord and the cable clamp on the machine body replace it if necessary by an authorized service provider 8 Discon...

Страница 11: ...the dough spiral under the bowl cover inside the mixing bowl and behind the mixing bowl 4 Wipe all surfaces with warm water 5 Apply a detergent sanitizer and leave on all surface 6 Scrub to loosen an...

Страница 12: ...tact supervisor service agent The mixer labors under load Belts screech Dough too stiff tight Machine malfunction Review and adjust dough consistency eg Add more liquid Contact supervisor Service agen...

Страница 13: ...r used in dough human error Incorrectly metered measured through water meter equipment error Over mixed dough Review recipe and adjust dough consistency Contact authorized maintenance Review check cha...

Страница 14: ...PARTS LIST 12...

Страница 15: ...PARTS LIST 13...

Страница 16: ...PARTS LIST 14...

Страница 17: ...PARTS LIST 15...

Страница 18: ...PARTS LIST 16...

Страница 19: ...SM200T012 15PDL1120 Belt 7M 1120 7pcs SM200T013 15ZCL6211VV Bearing 6211VV SM200T014 15ZCL6211VV Bearing 6211VV SM200T015 15YFL07 Oil Seal SM200T016 15ZCL6213VV Bearing 6213VV SM200T017 14M360 04 Bot...

Страница 20: ...djusting Plate for Top Motor L50 5T 240 Q235 SM200T045 14M320 20 02 Top Motor Pulley For 50HZ SM200T046 11M870 20 01 Machine Rear Cover 1 5T 788 524 SPCC SM200T047 14M330 20 Bottom Motor Pulley SM200T...

Страница 21: ...20 Transmission Shaft SM200T074 14M420 20 Fixing Seat SM200T075 14M845 04 Watertight Cover SM200T076 13M830 20 Bowl Roller Cover SM200T077 15ZCL6015VV Bearing 6015VV SM200T078 14M540 20 Bush SM200T079...

Страница 22: ...WIRING DIAGRAM 20...

Отзывы: