background image

After installation 

 
Once you have visually checked the installation of the new tap and all connections, ensure that all other fittings are closed 
except the tap which should be left open.  

 
Turn on your water heating system and ensure that your mains stopcock is open. Reconnect both the hot and cold water 
supplies to this fitting. 

 

Check the function of flow and function of hot, cold and mixed water. 

 

Turn off the tap and check carefully for any leaks around all connections on the fitting and adjoining plumbing. 
If possible return to the installation after a longer period to double check for slower leaks. If pressure testing equipment is 
available check the installation to the maximum recommended pressure. 

 
Clean the tap to remove any marks created during installation as instructed then place a bag over the product to protect the 
tap until it is ready for use. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

 

1. 

Once fitted turn water system on to 
flush system through, and check if the 
connections are water tight. 

 

2. 

Finish the tiling to the final aperture size. 

 

 

 

3. 

Discard plastic covers and brass water blockers as shown. 

Note: Do not discard 4 x bolts.

 

 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание Modo AB4095

Страница 1: ...d This is provided that the tap has been used for normal domestic purposes in the UK and that the care installation and maintenance instructions have been observed The warranty extends to the original purchaser only You should retain a copy of your dated invoice as proof of purchase to validate any claims under this guarantee Marks scuffs and scratches caused by improper installation or accidental...

Страница 2: ...or the product and plumbing connections If the rear wall surface is uneven then mount a level wood back board to the wall to ease installation The rear of the mixer body must be parallel with the finished wall surface All serviceable parts should be given suitable access to allow easy future maintenance When preparing the piping run to this mixer arrange the hot and cold pipes to be received to th...

Страница 3: ...ound all connections on the fitting and adjoining plumbing If possible return to the installation after a longer period to double check for slower leaks If pressure testing equipment is available check the installation to the maximum recommended pressure Clean the tap to remove any marks created during installation as instructed then place a bag over the product to protect the tap until it is read...

Страница 4: ...onnect hand shower holder E to decorative cover plate A as shown using 2 x screws supplied 5 Slot decorative cover A over parts B H flush against the finished wall surface 6 Fix spout B onto decorative cover A by tightening the grub screws using a 1 5mm allen key 7 Fix hand shower holder E to connector H by tightening grub screws using a 2 5mm allen key 8 Fix diverter handle C to valve F by tighte...

Отзывы: