After installation
Once you have visually checked the installation of the new tap and all connections, ensure that all other fittings are closed
except the tap which should be left open.
Turn on your water heating system and ensure that your mains stopcock is open. Reconnect both the hot and cold water
supplies to this fitting.
Check the function of flow and function of hot, cold and mixed water.
Turn off the tap and check carefully for any leaks around all connections on the fitting and adjoining plumbing.
If possible return to the installation after a longer period to double check for slower leaks. If pressure testing equipment is
available check the installation to the maximum recommended pressure.
Clean the tap to remove any marks created during installation as instructed then place a bag over the product to protect the
tap until it is ready for use.
1.
Once fitted turn water system on to
flush system through, and check if the
connections are water tight.
2.
Finish the tiling to the final aperture size.
3.
Discard plastic covers and brass water blockers as shown.
Note: Do not discard 4 x bolts.