Battery operation is possible by addition of a battery or batteries and battery
adapter to the operator. During a power failure the operator will revert to the
chosen battery operation mode. See Control point 15.
; when there is a smoke alarm fitted the operator reverts to MANUAL
mode, following which the door closes after a preset delay. During a smoke alarm
the door is opened manually and closes automatically after a preset delay (control
point 16).
; The operator and devices connected will operate during a
power failure. The operation time depends on number of openings and the current
draw of the devices fitted.
Normal number of openings is about 30 with 24V backup. The 12V batteries can be
used for doors not needing the 24V during power failure.
Fire door use
Full battery backup
Note! If battery is connected, put the battery operation ON. If battery operation is not
selected the battery will not be charged.
Battery test
When the power is switched on, the control unit tests the battery by loading it
for a 30 second period. If battery is found to be correct, it will be tested regulary
every 12 hours. Should the voltage be under 13 V (26 V), the test should be
continued until it has been charged to over 13 V.
A flashing red LED indicates a possible discharged battery. Test battery by
setting the control point 15 to 0 and switching the power off and on. When
selecting the battery operation, the operator tests batteries, if battery voltage is
over 13 Volts (26V). If the LED starts to flash, replace the battery.
When the red battery LED is flashing...
Adding batteries
Fire door use : DA131 (1 pcs 12V/2.2Ah + battery adapter)
Full battery back up: DA132; 24VDC (2 pcs 12V/0.7Ah + battery adapter)
DA131; 12VDC (1 pcs 12V/2.2Ah + battery adapter)
Spare part batteries: 7891/000000; 12VDC/2.2Ah
DA130; 2 pcs 12V/0.7Ah
BATTERY OPERATION
12V/2.2Ah
12V/0.7Ah 12V/0.7
Ah