4.4  Use with Extended Battery Bank 

 

 

Caution--- 

Battery bank connectors are color coded as show below. Do not try to install 
battery bank with connectors that are a different color from the battery 
bank connector in the UPS. 

 

UPS model 

Nominal System 

Voltage 

(connector color) 

Battery Bank model 

1000VA 24VDC 

(red) BBC08I00070 

1500VA 24VDC(red) BBC08I00090 

2000VA 48VDC(yellow) 

BBC08H00070 

3000VA 48VDC(yellow) 

BBC08H00090 

 
 

4.5    Installation the UPS with Battery Bank 

 
Step1 
 

 

 

 

19

 
Step2 

 

 

4.6    Connect Extended Battery Bank to UPS 

 

 

 
 

Содержание JP-PRO XL 1000

Страница 1: ... 11 3 9 LCD Display Panel 12 3 10 UPS Real Panel 13 4 INSTALLATION 16 4 1 Connect Utility and Load 16 4 2 Connect Network Surge protection 17 4 3 Connect Computer Interface Port 17 4 4 Use with Extended Battery Bank 18 4 5 Installation the UPS with Battery Bank 18 4 6 Connect Extended Battery Bank to UPS 19 5 OPERATION 20 5 1 Turn on the UPS 20 5 2 Turn Off the UPS 20 5 3 Plug in Charge 20 5 4 Aut...

Страница 2: ...terface conveniently offers a plug and play USB or RS232 port for connecting with nowadays IT products 3 2 IMPORTANT SAFETY INSTRUCTION 2 1 An Important Notice 1 The UPS has its own internal energy source battery Should the battery be switched on when no AC power is available there could be voltage at the output sockets 2 Make sure that the AC Utility outlet is correctly grounded 3 Do not open the...

Страница 3: ...g the UPS from one place to another It might cause electrical shock if the output is not cut completely 2 2 Storage Instruction For extended storage through moderate climate the batteries should be charged for 12 hours every 3 months by plugging the UPS power cord into the wall receptacle and turn on input breaker on front panel Repeat this procedure every 2 months under high temperature environme...

Страница 4: ...llow the instructions below 1 Keep at least 20cm 8 inches clearance from the rear panel of the UPS from the wall or other obstructions 2 Do not block the air flow to the ventilation openings of the unit 3 Please ensure the installation site environmental conditions are in accordance with the UPS working specifications to avoid overheat and excessive moisture 4 Do not place the UPS in a dusty or co...

Страница 5: ...8 3 6 Tower Setup Stand alone unit Step1 Step2 9 3 7 Rack Mount Setup Step1 Step2 ...

Страница 6: ...10 Step3 Step4 Step5 11 3 8 UPS Front Panel ...

Страница 7: ...PS Output Indicator 13 Polarity Error or Ground Fault 14 Overload 15 Load Battery Level 16 Load Battery Level Indication Control Button 13 3 10 UPS Real Panel 1000 1500VA 1 2 3 4 5 7 8 9 6 10 110 115 120V Rear Panel 1 2 3 4 5 7 8 9 6 10 220 230 240V Rear Panel 1 RJ45 Port 2 DIP Switch 3 USB Communication Port 4 RS232 Communication Port 5 Output Breaker 6 Outlet 7 Rating Label 8 Input Fuse 9 Input ...

Страница 8: ...Inlet 8 EXT Battery connector 15 3000VA 1 2 3 4 5 1 7 6 2 6 1 6 1 6 3 5 1 5 2 8 110 115 120V Rear Panel 1 2 3 4 5 3 6 4 7 6 5 8 5 3 220 230 240V Rear Panel 1 RJ45 Port 2 DIP Switch 3 USB Communication Port 4 RS232 Communication Port 5 Output Breaker 5 1 Output Breaker for 6 1 5 2 Output Breaker for 6 2 5 3 Output Breaker for 6 4 6 Outlet 6 1 NEMA 5 15 Receptacles 6 2 NEMA 5 20 Receptacles 6 3 Outp...

Страница 9: ...w Caution Do not connect a laser printer to the UPS outlets 17 4 2 Connect Network Surge protection Connect a 10 base T 100 base T network cable with the RJ 45 network surge protection IN jack on the rear of the UPS Connect from the OUT jack with network cabling to network equipment IN OUT 4 3 Connect Computer Interface Port Connect the supplied interface cable RS 232 or USB Optional between the i...

Страница 10: ...t are a different color from the battery bank connector in the UPS UPS model Nominal System Voltage connector color Battery Bank model 1000VA 24VDC red BBC08I00070 1500VA 24VDC red BBC08I00090 2000VA 48VDC yellow BBC08H00070 3000VA 48VDC yellow BBC08H00090 4 5 Installation the UPS with Battery Bank Step1 19 Step2 4 6 Connect Extended Battery Bank to UPS ...

Страница 11: ...e 1 If the Input Power Cord is connected to the wall receptacle properly and the utility is normal the UPS will start charging automatically without processing Turn On procedure 21 2 You have to charge for at least 8 hours every 3 months to avoid from battery self over discharge naturally if the UPS is in an idle condition 5 4 Auto Restart If the Input Power Cord is connected to the wall receptacl...

Страница 12: ...8 10 hours to see whether the RED LED will be extinguished after the Self test function is executed again 2 In case the RED LED remains unchanged you may unscrew the Easy Swappable Battery cover replace a new battery then push the On Switch to disable the RED LED Please follow the steps 1 3 to replace the new battery Caution The UPS will remain at NO output if the start up operation is not proceed...

Страница 13: ...24 6 2 How to Replace Battery STEP 1 STEP 2 25 STEP 3 6 3 Recycling the Used battery Contact your local recycling or hazardous waste center for information on proper disposal of the used battery ...

Страница 14: ...o Sensing Normal mode 50 60Hz 0 5Hz Auto Sensing Backup mode Regulation Normal Mode 12 to 8 of nominal voltage Regulation Backup Mode nominal output voltage 0 5 Voltage Waveform Sine Wave Efficiency 95 Normal mode 80 Backup mode Over lode protection 110 Normal mode 120 Backup mode Battery 1000VA 1500VA 2000VA 3000VA Battery Voltage 24v 24V 48V 48V Quantity 4pcs 4pcs 8pcs 8pcs Type Sealed maintenan...

Отзывы: